Cost Focal Point responsible for integrated cost engineering, cost control, VOWD calculation, cost reporting and cost forecasting on the multi-billion US$ Mangala onshore full field, phased development project. Prepared cost pack and Executive Board papers. Coached and mentored two Cost Engineers. Identified cost trends and proposed solutions to avoid unnecessary cost and time escalation. Performed foreign exchange rate impact sensitivity analysis. Cost focal point for planning and setting up cost engineering, cost control, cost forecasting and budgeting requir