%100- Project Planning; Progress Reporting; Primavera P6

Lead/Senior Planning Engineer, CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1,

START Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Site Lead Planner, TIVENCA, Interconnection of Gas Transport Systems from Mid-Eastern to Western Venezuela (ICO) Phase II

START Date
END Date
Experience Hours (Planning & Scheduling)
200
Experience Hours (Cost Management)
200
Experience Hours (Forensic Analysis)
50

Planning and Control Engineer for Quality Assurance and Quality Control of the Interconnection of Gas Transport Systems from Mid-Eastern to Western Venezuela (ICO) Phase II (EPCC Project) Project with a key role in the development and management of a monitoring program for measurement the efficiency and efficacy  of the project. The main responsibilities included:

SENIOR Planning & Scheduling Engineer, QStech, POLYSILICON PROJECT

E
Eslam Awad 👤 Member for 14 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
0

q   Establishing and maintaining the Project WBS

q   Establishing and maintaining the Integrated Project Master Schedule

q   Integrating the Baseline Schedules from all Project stakeholders

q  Issuing and updating the Integrated Control Schedule

q  Progress Monitoring and Measurement

q  Project Progress Measurement (baseline versus actual versus forecast)

Project Planner, Metronet Atkins Station Design Team, (LUL/Metronet Affiliates Project) London

I
Ian Cameron 👤 Member for 20 years 4 months
START Date
END Date

Metronet (ASDT)                                                                                                &nb

Senior Project Planner, Amec Spie Rail (UK), NwR Signalling Works Geographical Partnering Arrangement framework

I
Ian Cameron 👤 Member for 20 years 4 months
START Date
END Date

Amec Spie Rail (UK) Ltd                                                                                          Senior Planner