%100- Project Planning; Progress Reporting; Primavera P6

Deputy Manager - Planning, Godrej & Boyce Mfg Co. Ltd., Process Equipment for Client-IOCL & Lanxess Chemical company.

START Date: 
February, 2011
END Date: 
September, 2011
  • Preparation & Tracking of the project schedule.
  • Weekly/Monthly reports generation including ‘S’-curves for Management review. Updating and monitoring of drawings and deliverable list.
  • Responsible for monitoring of material supply in Assembly shop for smooth progress of equipment.
  • Co-ordination with Engineering disciplines & operations for the Project deliverables to meet schedule.
Experience Hours (Planning & Scheduling): 
1150

Intermediate / Senior Planner, WSP | Parsons Brinerhoff, Preston to Blackpool

START Date: 
October, 2015
To draw up the overall project schedule and coordinate this with the detailed schedules of the various project disciplines.  Execute the programme with the relevant co-owners and continue to develop, manage and monitor the overall schedule  Advising on and monitoring critical pathways using advanced project management software such as Primavera. Independently and pro-actively supplying the necessary data in order to provide the most up-to-date and complete picture possible of the project's progress,

3D / 4D Planning Engineer, genesis manazil group, Building

START Date: 
August, 2013
END Date: 
July, 2016

As planning Engineer responsible for all the planning, scheduling, Reporting and many other works.

Construction Project Planner / Senior Planner, Brasfield & Gorrie, LLC, Piedmont Hospital Atlanta

START Date: 
July, 2016

Senior Planner / Scheduler

Roles and Duties currently include:

  • Support planning and scheduling across several divisions including Healthcare, Industrial, Heavy Civil and Retail
  • Build and maintain construction schedule for accurate forecasting and planning
  • Provide updates to project team including Owners, Architects, Engineers, and Subcontractors and Vendors
Experience Hours (Planning & Scheduling): 
2000

Lead Planning Engineer, MARATHON OIL, Brae A Rig Reactivation

START Date: 
January, 2012
END Date: 
September, 2013
Lead/ Senior Planning Engineer on the Brae Alpha Rig Reactivation Project preparation for decommissioning, (brownfield) • Achieved a fully integrated plan for Marathon combining the scopes for Archer Drilling and Petrofac. This covered the delivery of engineering, procurement, onshore equipment refurbishment, fabrication, offshore piece small destruct, stick build equipment installation, loop checking commissioning. This involved setting work break down structure, reporting structures & formats and integration with the platform schedules.
Experience Hours (Planning & Scheduling): 
12000
Experience Hours (Cost Management): 
10000
Experience Hours (Forensic Analysis): 
10000

Lead Planning Engineer, Marathon , Brae A Rig Reactivation

START Date: 
January, 2012
END Date: 
September, 2013
Lead/ Senior Planning Engineer on the Brae Alpha Rig Reactivation Project preparation for decommissioning, (brownfield) • Achieved a fully integrated plan for Marathon combining the scopes for Archer Drilling and Petrofac. This covered the delivery of engineering, procurement, onshore equipment refurbishment, fabrication, offshore piece small destruct, stick build equipment installation, loop checking commissioning. This involved setting work break down structure, reporting structures & formats and integration with the platform schedules.

ANALYST / PLANNING ENGINEER, TR, RAPID

START Date: 
August, 2014

Project Controls & Planning Engineer in a Refinery EPC Project: RAPID Project (Package 3).

Process Units: DHT, KHT, NHT, CNHT, CCR, HPU Common/HPU1/HPU2/HPU3, RPSA, SGP, Flare, Interconnecting & Air Systems.

 

Experience Hours (Planning & Scheduling): 
3950

Planning Engineer, BECHTEL INTERNATIONAL, INC, CDU-3

START Date: 
October, 2006
END Date: 
April, 2007

Responsibilities management schedule, summarize the analysis of project progress with emphasis on critical path. Escalate the potential problems with proposed solutions and updating project planned activities for the coming month

Experience Hours (Planning & Scheduling): 
1600

Project Planner, Ove Arup & Partners, Croxley Rail Link design programme

START Date: 
March, 2014
END Date: 
September, 2014

Contract Project Planner for Arup Ltd assisting on the maintenance and development of the Croxley Rail Link design programme for Network Rail and London Underground.  Liaising with designers and engineers from a wide range of disciplines, including Pway, Civils, Highways, Environmental and Safety, and issuing weekly reports to our client Taylor Woodrow.  Also tasked with the development of the Rail Resource programme and the production of various resourced bid programmes in P6 and MS Project as requested.

Experience Hours (Planning & Scheduling): 
1000

Junior Planner, EVRA Consulting (Pty) Ltd., Kusile Power Station Project

START Date: 
June, 2015

I started in the planning industry in June 2015 as an Assistant Planning Consultant and am now at Junior Planning Consultant