%100- Project Planning; Progress Reporting; Checkpoint Reporting; Resource Allocation; Risk Ananlysis

Planning Engineer, Malaysia Marine Heavy Engineering (MMHE), FPSO

START Date: 
March, 2008
END Date: 
March, 2014

Start as Planning Executive (so called Junior Planner) in 2008 working with MMHE - Malaysia Marine & Heavy Engineering. Helping in updating schedule and doing progress monitoring for project, weekly reports to management and client even completed the project with close out report. And promoted to Planning Engineer in 2010.

Project Involved:

2008-2009 : Turkmenistan GBS and Topside ; client Petronas-Turk)

2010-2012 : Tangga Barat Central Processing (TBCP-A) ; client  Petros Carigali

2012 - 2013 : Assigned to Technip Malaysia

Experience Hours (Planning & Scheduling): 
14000
Experience Hours (Forensic Analysis): 
1200

ANALYST / PLANNING ENGINEER, Ayyapan Enterprises Pvt.LTD, Storm Water Drainage Project (RCC Pipeline)

START Date: 
February, 2016
END Date: 
August, 2016
  • Schedules, Plans and oversees the entire program of works
  • Plans, Organizes, and coordinates Planning Activites
  • Select the most appropriate techniques and logical sequence of activites to complete the Proje ct scope
  • Inputs the work break down structure information in means to assess an accurate forecast on time, resources and cash flow of the project.
  • Sets up alerts for all important contractual and milestone dates.
  • prepara cash flow, charts and histogram on planning projects.
  • Verifies critical path and interfaces between design/ Engineeri
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1000

Lead Planning Engineer, Sarawak Shell Berhad, Malikai Deepwater Project-Oil

START Date: 
August, 2006
END Date: 
January, 2017
Planning
 Ensuring the established planning and schedule methodology is fulfilled as in the developing project schedules.
 Managing contractor performances and to ensure they compliance with the established scheduling methodology.
 Planning and coordinating the schedule development process.
 Supporting the development of the Work Breakdown Structure to enhance project delivery.
 Developing project milestones and progress tracking baselines.
 Supporting schedule risk analysis and schedule contingency determination.
Experience Hours (Planning & Scheduling): 
20000
Experience Hours (Cost Management): 
10000
Experience Hours (Forensic Analysis): 
10000