Planner, Odebrecht Construction Inc., Neckarthal RCC Dam

START Date: 
April, 2011
END Date: 
August, 2011

Project Planner dealing with the schedule and other studies related with the optimisation of resources

Senior Planner, PENGEST, Expo´'98 Lisbon

START Date: 
October, 1997
END Date: 
June, 1998

Part of a team of planner task with the planning supervision for all of Expo'98 infrastructure.

Acting Planning Manager, Fochi / Montreal / Metalgrupo / Crismetal consortium, Sines refinery upgrading

START Date: 
March, 1992
END Date: 
March, 1993

Construction planning Engineer

Master schedule, Quantities estimation, physical progress, internal and external reporting, Consortium representative for contract close out with client.

Design / Construction - Planning Engineer, Consortium formed by: Koch, Bentro Pedroso, CME and KBB, Carriço Gas Storage

START Date: 
July, 2000
END Date: 
July, 2002

Planning Engineer

Establish master and detailed scheduling for consortium.

Progress measurement, partners and client liase, internal and external reporting, progress curves, simulation of scenarios

Trainer and Maintenance planner, SOMINCOR, Neves-Corvo Mine

START Date: 
September, 1982
END Date: 
September, 1990

As Trainer:

Elaboration of training manuals and programs in all mining disciplines.

Production of some operation manuals in conjunction with Performance Associates Inc. (USA).

Miners trainig at undergorund (Load haul dumpers, explosives, drilling jumbos, etc)

 

As maintenance planner:

Establish preventive routines for all mining equips,

System loading with M/H, materials, tools for all preventive routines for the surface ore treatment facilities

Construction Planner, Foster Wheeler France, ESD Sines Refinery

START Date: 
November, 1999
END Date: 
June, 2000

Construction Planner for ESD Project at Sines Refinery for Foster Wheeler France

Maintenance / Operation Lead Planner, Montajes Nervion, Pego Power Plant (Coal fired)

START Date: 
November, 1993
END Date: 
November, 1997

Maintenance planner.

Preventive maintenance, Maintenace system programing, system loading with check list for maintenance, implementation of vibration recording procedures and interpretation. Maintance by time interval, utilization, etc.

Experience Hours (Planning & Scheduling): 
7000

Abel Santos Silva

First Name: 
Abel
Last Name: 
Santos Silva
Professional Since: 
Mar-1979 (45.4 yrs experience)
Years Experience: 
0

Helder Amaro

First Name: 
Helder
Last Name: 
Amaro
Professional Since: 
Jan-2002 (22.5 yrs experience)
Oldest experience: 
Apr 2009 (15.3 yrs experience, WARNING: 7.2 years variance with Professional Since)
Years Experience: 
1

João Perestrelo

First Name: 
João
Last Name: 
Perestrelo
Professional Since: 
Mar-1995 (29.4 yrs experience)
Oldest experience: 
Feb 2009 (15.4 yrs experience, WARNING: 13.9 years variance with Professional Since)
Years Experience: 
1

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content