Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Indonesia (AS.ID)

Civil Engineer, Shimizu Corporation, Gas Development Project onshore and offshore

START Date: 
April, 2006
END Date: 
March, 2009

MY JOB IS ON CIVIL ENGINEER, AND I USE PRIMAVERA TO MAKE SCHEDULE FOR CONSTRUCTION

Gatet Prasojo

First Name: 
Gatet
Last Name: 
Prasojo
Professional Since: 
Mar-2007 (17.8 yrs experience)
Oldest experience: 
Oct 2012 (12.3 yrs experience, WARNING: 5.6 years variance with Professional Since)
Years Experience: 
43

Project Planner, J. Ray McDermott Asia Pacific Pte. Ltd, Inpex ICHTHYS URF

START Date: 
October, 2012

I am working as a Project Planner in McDermott International Batam Fabrication Yard, Indonesia.

My job is to make a schedule based on project request, re-forecasting, progress report, from activity until manhours progress.

anissa madewa

First Name: 
anissa
Last Name: 
madewa
Oldest experience: 
Jun 2009 (15.6 yrs experience, WARNING: 39.4 years variance with Professional Since)
Years Experience: 
43

Civil Engineer, Indokoei, Thermal and Hydro Power Plants

START Date: 
June, 2009

Jr. Civil Engineer at an International Engineering Consultant working as Scheduler and Cost Estimator

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Irwan Supriadi

First Name: 
Irwan
Last Name: 
Supriadi
Oldest experience: 
Jun 2010 (14.6 yrs experience, WARNING: 40.4 years variance with Professional Since)
Years Experience: 
3

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Market Place

No results found... (try selecting a different content filter)

Syndicate content