Planner Project

Planner Project, SGS, Puma Klabin Project

START Date: 
April, 2015
END Date: 
January, 2016
Notifying the commissioning team the released engines for testing of Cables Continuity (Electric room x field); Physical infrastructure, Advancement Report, cable launch; Connecting cables in motors and instruments, Assembling Electrical equipments and instruments;Critical Path Analysis – Interface between the phases of Civil construction, Mechanical, electrical, instrumentation, automation and commissioning;Issuance and Upload Check-List electrical assembly of motors, panels and Instruments in the system Pims completion Valpro;Issuance of Labor histogram.
Experience Hours (Planning & Scheduling): 
1550
Experience Hours (Cost Management): 
1550
Experience Hours (Forensic Analysis): 
1550

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.

Planner Project, PTNNT, New Crane Shop Project

START Date: 
June, 2010

 

  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.
  3. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  4. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.