1. Receiving Delivery Orders based on Assignment Contract of Critical Parts from 37 powerplant of Fast Track Project 1 PLN.
2. Implementing Direct Contract to OEM based on the Delivery Orders (including clarification of technical specifications between users and manufacturer until settlement of contract with manufacturer).
3. Processing claims to manufacture based on users findings of the critical parts.
Jun 2017- present PT INTI KARYA PERSADA TEKNIK (IKPT)
Assigned as SITE PLANNING AND SCHEDULING ENGINEER for Lumut Balai Geothermal Power Plant Project (55 MW) at Muara Enim, South Sumatera, Indonesia. Client: PT Pertamina Geothermal Energy (Marubeni Corporation).
• Developed detail construction schedule, expand from Project Master Schedule for better work and progress monitoring for construction team and client. Liaised and coordinate with subcontractor and discipline engineer to come up with agreed workable construction schedule.
Sep 2016 – Jun 2017 PT ADHI KARYA (Persero) Tbk.
Assigned as PROJECT CONTROL ENGINEER for 2 x 7 MW Fired Coal Steam Power Plant Project (PLTU) at Tembilahan, Indragiri Hilir, Riau Province, Sumatra Island, Indonesia; Owner: PT.