Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Indonesia

Planning & Project Control Engineer, PT ADHI KARYA, 2 x 7 MW Fired Coal Steam Power Plant Project (PLTU) at Tembilahan, Indragiri Hilir, Riau Province, Sumatra Island, Indonesia

START Date: 
September, 2016
END Date: 
June, 2017
Sep 2016 – Jun 2017 PT ADHI KARYA (Persero) Tbk. Assigned as PROJECT CONTROL ENGINEER for 2 x 7 MW Fired Coal Steam Power Plant Project (PLTU) at Tembilahan, Indragiri Hilir, Riau Province, Sumatra Island, Indonesia; Owner: PT.

Mechanical engineer/planning Engineer, SAS International, PT, Removal MRU PetroChina Jambi, Jabung, Indonesia

START Date: 
March, 2014
END Date: 
June, 2014

SAS Internasional, PT  – Contractors Oil and Gas

Business: EPC Oil and Gas

MECHANICAL ENGINEER, Mar 2014 – June 2015

Ensuring that all drawing, materials, contractor, certificate material, report progress project, prepare schedule.

Duties

·         Prepare schedule project MRU

·         Controlling material, Contractor

Experience Hours (Planning & Scheduling): 
100
Experience Hours (Cost Management): 
100
Experience Hours (Forensic Analysis): 
100

Project Planner Turbine, Torishims Guna Engineering, Major Overhoul T/G Unit 500 , Chevron Geothermal Salak, Indonesia

START Date: 
June, 2015

Torishima Guna Engineering, Tbk  –Gas Turbine, Steam Turbine, Pump, Diesel Engine

Business: Engineering Service, Indonesia Company and cooperation with Torishima Pump Japan

 

PROJECT PLANNER TURBINE, June 2015-Present

Experience Hours (Planning & Scheduling): 
300
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
250

Project Planner Turbine (Mechanical Rotating), Torishima Guna Enegineering, Major Overhoul T/G Unit 500 Chevron Geothermal Salak, Indonesia

START Date: 
June, 2015

WORK EXPERIENCE

  1. Torishima Guna Engineering, Tbk  –Gas Turbine, Steam Turbine, Pump, Diesel EngineBusiness: Engineering Service, Indonesia Company and cooperation with Torishima Pump Japan

PROJECT PLANNER TURBINE, June2015-Present

Experience Hours (Planning & Scheduling): 
350
Experience Hours (Cost Management): 
350
Experience Hours (Forensic Analysis): 
250

Senior Planning Engineer, Eramet Group, Indonesia, Weda Bay Nickel Project

START Date: 
February, 2012

ERAMET Group is Mining and Metallurgical Company that offers technological know-how from ore mining through recycling. Currently the Planning and Schedulling Manager for the Weda Bay Nickel Project composed of One (1) EPCm and Three (3) EPC packages which is forecasted to be operational in 2017. As a representative of the Owner, it is my responsibility to monitor and challenge the schedule and progress reported by the various Contractors. Ensure that the proper interface between the 4 packages. 

Sr Structural Engineer, Archen Technologies - a wholly owned subsidiary of San Miguel Corp., San Miguel Corp. - PET Multi Product Plant Facilities Project , San Fernando Pampanga,Cagayan de Oro, Davao, Philippines, Amarit, Thailand and MM2100 Industrial T

START Date: 
September, 2002
END Date: 
June, 2005

Prepared structural design and analysis of permanent works associated with San Miguel Corp. Polyethylene Multi Product Plant Facilities and other various industrial buildings both in steel and concrete, well verse in use of Structural Aided Design Softwares such as STAADPro, PCACol, Enercalc and Microfeap.

Senior Site Planner, Alstom Power - Marubeni Corporation Consortium, Muara Tawar Combined Cycle Power Plant Extention Project Block V, Bekasi, Indonesia

START Date: 
October, 2009

Person in charge for for planning and scheduling in Project Control / Services Department.

Supporting Project / Construction Manager with project analysis, reporting, budget forecasting and change management.

Making Basis of Schedule based on information from Procurement-Engineering-Construction-Commissioning and Operation Department.

Market Place

No results found... (try selecting a different content filter)

Syndicate content