Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project
Petrochamical & utilities
Posted Sat, 2015-01-10 13:01 by Rizvan patel
START Date:
January, 2001
END Date:
September, 2008
- Organize and conduct preventive, predictive, opportunity based maintenance, overhauling, shutdown of the rotary as well as static equipments.
- Primary role is to provide the required technical and engineering support to MEG Maintenance to safely and reliably maintain its plant.
- Coordinate, review and assign appropriate maintenance strategy (PM,Run to Fail) using methodology like Failure Mode Effect Analysis (FEMA).
- Company:
- Industry:
- Job Role:
- Project:
- Region:
Posted Sat, 2015-01-10 12:50 by Rizvan patel
START Date:
January, 2001
END Date:
September, 2008
- Organize and conduct preventive, predictive, opportunity based maintenance, overhauling, shutdown of the rotary as well as static equipments.
- Primary role is to provide the required technical and engineering support to MEG Maintenance to safely and reliably maintain its plant.
- Coordinate, review and assign appropriate maintenance strategy (PM,Run to Fail) using methodology like Failure Mode Effect Analysis (FEMA).
- Company:
- Industry:
- Job Role:
- Project:
- Region:
Market Place
No results found... (try selecting a different content filter)
Website Development by Hunt Data Solutions and Vit-al Interactive. CMS:
Drupal THEME:
Acquia Marina