Project Planning Engineer, ALEC - Al Jaber Engineering & Contracting (ALEC) L.L.C., Airport, and villas, Bungalows, Hotels & Luxury Apartments, Resorts, Shopping Malls, Towers & High Rise Buildings

START Date: 
July, 2006
END Date: 
July, 2010

·       Development of Pre- Contract and Post- Contract Program Schedules, Work Breakdown Structures, Project Execution Plan and Method Statements

·       Coordinate with Project Team, Commercial dept., Engineering dept., Procurement dept., to prepare PM Budget, Project Cash Flow and Histograms, Information Required Schedule, Engineering Schedule, Material Submissions and Procurement Schedule

Project Controls Engineer, Reflexion India Pvt. Ltd., Resort, Bungalows & Villas

START Date: 
June, 2003
END Date: 
May, 2006

•     Installation of all types of electrical conducting, LV Panels, MDB, SMDB, DB, and wiring for lighting circuit, power sockets outlet, isolator’s outlet, circuit breaker, FCU and thermostat outlet, socket system, building lighting, highway lighting, etc.
•     Installation and piping of automatic control system including sensors, controller, water level control system, fountain sequencing control system, telephone outlet, intercom outlet and panel, TV outlet, audio/video, camera, security systems, heat and smoke detectors.