Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Senior Planner

Senior Planner, EC Harris, London 2012

START Date: 
March, 2007
END Date: 
May, 2007

March – May 2007: EC. Harris, London, UK. Successful prosecution of a major infrastructure tender for the 2012 London Olympic Games site using P3e to co-ordinate data from multiple disparate joint venture members to produce the final bid programme. The client was EC Harris and the task involved representing the LVU (Lee Valley Utilities) joint venture bid for the design and construction of the London Olympic Park utilities.

Senior Planner, Midas Construction, Various Building & Civil Engineering Projects throughout the UK

START Date: 
October, 2001
END Date: 
October, 2005

All PQQ, Tender, Construction Programmes for the South West Region

Senior Planner, ISG Pearce Group Ltd, Various Building & Civil Engineering Projects throughout the UK

START Date: 
November, 2005
END Date: 
June, 2009

All PQQ, Tender, Construction Programmes for the South West Region

Senior Planner, Fluor, TCO – Wellhead Pressure Management Project

START Date: 
August, 2011
END Date: 
May, 2014
  • Develop Pre-FEED schedule and progress tracker documentation including progress curves.
  • Develop with Project Controls team Level 2 FEED EPC for a full Future Growth Project including the WPMP element with a 4 Case scenario for submission to client for Risk Analysis and payment gate approval.
  • Level 3 schedule for FEED to be developed based on RA outcome from client.

Senior Planner, Contrack International Inc, Al Sidra Medical Research Centre

START Date: 
February, 2008

Sr Planner - SIDRA Medical Hospitan and Research centre project.

Leading a team of Planners and engaged in the Client / Sub contractors Scheduling and Controlling, Preparation of Time Impact Programs, Detailed monitoring of KPI of the Individual Trades in progress etc.

 

A Certified PMP from PMI USA  and certified PSP from AACEI, USA.

Senior Planner, Bombardier, Gautrain

START Date: 
December, 2007

Achievements

  • Develop and baseline the Communications  and Automatic Fare Collection Program integrating this into the Master Program which consists of 10 other interproject linked sub-system programs
  • Appointed Master Scheduler & Primavera Administrator requiring sole ownership of the live databases as well as Primavera administrative duties
  • Project Controls senior scheduler, responsible for collating progress and producing monthly progress reports for senior management as well as the client

Senior Planner, Aecon Lockerbie, Refinery-Upgrader Complex to produce petroleum products as required by marketing departments

START Date: 
November, 2006

- Responsible for scheduling, cost control, and production of progress and productivity reports.

- Supervise, coach and mentor planning staff on day-to-day work

- Planning and leveling of overall project resources based on individual area requirements

- Collecting, maintaining, organizing, and analyzing the Earned Value 

Market Place

No results found... (try selecting a different content filter)

Syndicate content