Planning and Project Control manager, Nama chin Fars Co., 3th Urea & Ammonia Plant - Shiraz Petrochemical

START Date: 
August, 2008
END Date: 
March, 2010

Plan and execute projects and commercial feasibility studies, evaluation and supervision of respective projects in accordance with the planned objectives, cost and schedule Civil activities

planning and project control manager, NDEC, 3rd Urea and Ammonia Pardis Petrochemical

START Date: 
May, 2011
END Date: 
May, 2016
  1. Involved in the all project life cycle from initiating activities up to end of construction phase

  2. Defining a Work Break down Structure of project based on contract strategy

  3. Defining the instruction to generating the weight factor of each level of project, based on mixing the impact of duration, cost and complexity

planning and project control manager, PT. Tripatra Engineers and Constructors, Concept, FEED, Detail Engineering & Procurement Services for Offshore Platform, Pipeline & Onshore Plant

START Date: 
April, 1996

More than fifteen (15) years experience in Project Management, Construction Management, Project Scheduling, Cost Control and Project Reporting for Engineering Procurement Construction Commissioning Project (EPCC) and Engineering Project. The experience includes: Prepared of Master, Detailed and Integrated EPCC schedules. Prepared of manpower planning for Engineering, Procurement, Construction, and Pre-commissioning / Commissioning. Projected completion dates and monitored progress toward milestones.

planning and project control manager, SADRA (Iran Marine Industrial Company), South Pars Gas Field Development Phases 13 & 17 & 18 & 22 & 23 & 24 / Offshore Facilities and Pipeline

START Date: 
December, 2010
END Date: 
April, 2012

 

KeyDuties:

·         Preparation of various Procedures related to Planning and Project Management

·         Defining the Projects Breakdown Strategy based on organizations.

·         Preparation of offshore projects Integrated Master Schedules in high level.

planning and project control manager, CB&I Lummus, Sohar SREP - FEED Phase

START Date: 
January, 1990

Since 1987 gained extensive experience in all aspects of planning on various refining and petrochemical projects throughout Europe and the last assignment was in Singapore. Have been assigned in the capacity of Lead Planning Engineer on most EPC projects during the engineering / procurement phase as well as on the construction site. Present position is Project Control Manager

planning and project control manager, isi, (1)Renovation and Reconstruction of Foroozan Offshore Complex, Engineering Project, Khark Island

START Date: 
July, 2005
  • Preparing the baseline plan for the project & update the schedule.
  • Continuous relation with site and going on required missions.
  • Preparing Work Breakdown Structure.
  • Preparing Master Document List and Register.
  • Preparing daily, weekly and monthly reports.
  • Preparing Monthly Financial Invoices.
  • Preparing Change order reports.
  • Preparing management and any other required reports.
  • Preparing forecast activities for the coming month.
  • Making database for correspondence and follow up.
  • Coordi

planning and project control manager, Maire Technimont, Maritza East Coal Power Plant

START Date: 
September, 1990
END Date: 
March, 2011

2010-present

Employed to  SIBUR / FLOUR

Project:  RUSSIA, Tobolsk

Position : Senior Project Control Manager.

2009 – 2010

Employed to  ALSTOM POWER ; Client: AES Corporation

Project:  BULGARIA Maritza East 1 – Coal Power Plant - 2 x 300 MW, Euro= 780 M

Position : Senior Planning Eng.

2008 – 2009

Employed by  MELLITAH ( AGIP ) Oil & Gas Libya(Oil Operator); £ 867 M

Location:  Tripoli, Libya

planning and project control manager, Samsung Engineering Co., Shah Gas Development Program & Qatar Fertilise Project

START Date: 
June, 2009
END Date: 
August, 2011

- Cost control, Document control and Schedule control

- Preparing for whole work procedure and report to client

- Developing for EPC master schedule by Primavera

- Developing for EPC baseline schedule by Primavera

- Analysis for EPC master schedule by Risk Management Tools

- Coordination to E, P, C & M

planning and project control manager, Maire Tecnimont, Sibur_polimer PDH

START Date: 
March, 1990

Reporting to Project Controll Mangar I was responsible for :
•     Generate initial schedule for project
•     Build an integrated project planning operation – people, processes, tools and information which delivers the key functions as outlined in the job summary and is fully compliant with the company Standards and WBS.
•     Close cooperation and control of the activities with a team of Scheduling/Reporting engineers.
•     Participation to the evaluation of Tenders for the par

planning and project control manager, Oil Turbo Compressor, IGAT5, TC50

START Date: 
March, 2005
END Date: 
May, 2011
 
  1. Practicality analysis the risk of the gas station schedule and report to senior management
  2. Training the project managers and project schedulers of the company to use the P6.0 V7.0 in client server
  3. Designing the procedure needs in EPC project as a Coordination procedure, Vendor Project control procedure, Vendor Numbering procedure…
  4. Template the schedule of the gas station by more than 90 % accuracy in practical logical relationship in EPC
  5. Analysis the S-Curve and report the variances, threats, solutions to senior management by presentatio

Market Place