I was Chief Cost Engineer in the construction of a Plaza, Museum and Offices in Caracas, Venezuela. This construction site covered 4 acres and included 4 underground levels and 6 floors of building. I was involved in the full range of civil construction, including structure build, pouring of 60,000 cubic meters of reinforced concrete, masonry work, painting, electrical, plumbing, and asphalt installations.