Lead Planning Engineer, Doosan Power Systems, LISCO - Thermal Power Project

START Date: 
January, 2013
END Date: 
August, 2014

Name of employer: Doosan Power Systems

Date: January 2013 - August 2014

Position: Lead Project Planning Engineer

Experience Hours (Planning & Scheduling): 
36950
Experience Hours (Cost Management): 
22050
Experience Hours (Forensic Analysis): 
13050

Nishant Kumar Gupta

First Name: 
Nishant Kumar
Last Name: 
Gupta

 MS Office (Excel, Word), Auto Cad 2010, MSP 2007, Primavera P 6.              

Professional Since: 
Sep-2009 (15.2 yrs experience)
Oldest experience: 
Sep 2009 (15.2 yrs experience)
Years Experience: 
43

Planning Engineer, DOOSAN POWER SYSTEMS, NTPC 3*800MW STPP,Kudgi

START Date: 
September, 2009

Ø  Study the Contracts, Schedules, BOQ, Specifications, Drawings, Scope of supply and other Job related details.

Ø  Preparation of Schedules as per the Contract and as well as requirement of client using Primavera with detailed work break down structure & activities and tracking time to time with S- Curve for the Control of Projects.

Tom Clarkson

First Name: 
Tom
Last Name: 
Clarkson
Oldest experience: 
Jan 2013 (11.8 yrs experience, WARNING: 43.0 years variance with Professional Since)
Years Experience: 
43

Senior Technical Clerk , DOOSAN POWER SYSTEMS, KG Flex Grangemouth

START Date: 
January, 2013

My role of Senior Technical Clerk at Doosan is to liase with management and clients on progress reporting, compiling lifetime quality records for the client, gathering all welding information incuding weld procedures, NDE reports, heat treatment reports and charts, welder qualifications and pressure test certification to enter into a welding system database, thus producing a document package for the client. 

Rajkumar S

First Name: 
Rajkumar
Last Name: 
S
  • Streamlining Project work scope & establishing the scope matrix by organizing the project kickoff meeting with client.
  • Organizing one day planning meeting internally to discuss and to make a common understanding of various aspects of the project.
  • Structuring WBS either in EPC or Package basis with respect to client requirement.
  • Preparation & Finalization of Project Client contractual Level-2 Schedule based on contractual completion.
  • Preparation & Finalization of Project Internal monitoring level-4 schedule.
  • Identifying Con
Professional Since: 
Jul-2005 (19.3 yrs experience)
Oldest experience: 
Jul 2005 (19.3 yrs experience)
Years Experience: 
42

Senior Planning Engineer (Thermal Power), DOOSAN POWER SYSTEMS, Construction of thermal power plants

START Date: 
July, 2005

 

Company Name

Location

Duration

Designation

Total Years

Daniel Such

First Name: 
Daniel
Last Name: 
Such

Planning (utilising P6 & P3):

  • Creating, updating and maintaining the programme for multi-functional project teams
  • Managing the Schedule to achieve key milestones.
  • Forward planning; scheduling, identifying threats in a timely manner for corrective action, re-scheduling activities and mitigate lost time.  
  • Running ‘what if’ scenarios.
  • Managing resources.
  • Calculating Earn Value from resources in accordance with the budget.
  • Accurate logging of data, then interpreting and review supplied information
Professional Since: 
Feb-2008 (16.7 yrs experience)
Oldest experience: 
Oct 2007 (17.1 yrs experience, WARNING: 0.4 years variance with Professional Since)
Years Experience: 
3

Planning Engineer, DOOSAN POWER SYSTEMS, Selective Catalytic Reduction (SCR) - Ratcliffe Power Station

START Date: 
November, 2010

 

Doosan Power Systems

I am currently working as is a Planning Engineer at Ratcliffe Power Station.

JYOTI SAHU

First Name: 
JYOTI
Last Name: 
SAHU
Professional Since: 
Jun-2002 (22.4 yrs experience)
Oldest experience: 
Jan 2009 (15.8 yrs experience, WARNING: 6.6 years variance with Professional Since)
Years Experience: 
41