Continues Employment contract with ASCO Qatar till present.
Project: Abu Hamour Surface & Ground Water Drainage Tunnel Phase 1, was design and construction of 9.5 kilometre long and 3.7 meter pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also included 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).