Technical Office Engineer, Planning, Cost Control, Atilla İnş. Tur. ve Tic. A.Ş., Multiple (9) Projects, Ankara, Turkey

START Date: 
April, 2001
END Date: 
January, 2003

Technical Office. Infrastructure work monthly due reports(İller Bank), Biding Dossiers, Price Assessments.

Project details:Works consisting of the construction of the foul water and rainwater systems for various small cities.

●      Monthly due reports for various construction sites (nine sites at peak, minimum 5 sites).

●      Follow-up (seek approval) on location of two site due reports with client.

●      Biding dossiers calculations as required by master Engineer.

●      Price assessments,