Terminal Maintenance & Project Engineer, Mapak Qasim Bulkers Pvt Ltd ( Malaysia & Pakistan joint venture), Construction Steel STorage tanks and offshite utilities piping

START Date: 
November, 2004
END Date: 
June, 2006
  1. Fabrication of Storage Tanks, ducts, pipe alleys, handrails ,staircases and other

Miscellaneous fabrication Works. QC checks e.g Dimensional check, Dye Penetrate test, Radiography test etc according to <?xml:namespace prefix = st1 />API 650 and ASME Standards.

  1. Ensure that the storage tanks, pipelines, equipment, electrical systems and civil structure etc of Terminal are in sound condition.
  2. In case of any breakdown in the Terminal machinery, act promptly to rectify the defect in order to maintain smooth operation of the Terminal Utilities i-e Generators, Boiler , Compressors, pumps and other management facility.
  3. In case of any improvement required, discuss/ suggest/ submit proposal to Senior Executive for approval and/ or further actions.
  4. Ensure maintaining the general cleanliness and good housekeeping within the facility.
  5. Prepare feasibility for the upcoming projects for management review.
  6. Coordinate with contractors and terminal work-force to achieve the optimum efficiency for all engineering works being under taken within the terminal facility.
  7. Any other assignment given to me from time to time by Senior Executive.