Acting Planning Manager, IL&FS ENGINEERING & CONSTRUCTION CO. LTD., PIPELINE CONSTRUCTION

START Date: 
March, 2002

DUSHYANT SHARMA

C-44/34 Rishi Nagar Extension, Ujjain (Madhya Pradesh), India - 456010

Mob: +91 9713580534

Passport No.: J2411784

E mail:dushisharma22@gmail.com


Introduction & Experience summary:

I have 10.6 years of experience in Oil & Gas Pipeline EPC Projects. I am continuously learning to handle various responsibilities, situation and adopting strategies to manage the project in low cost high yield ratio to deliver the system to client satisfactorily. Project planning, control, coordination, management and site execution are the key areas of my interest.

 

Following are the acquisitions, which I practice and congregate comprehension, with details of employers and executed projects:

 

1.      Project management, planning, scheduling, budgeting, monitoring, and resource management etc.  

2.      Client Billing. (Running, Extra & AHR billing)

3.      Contractor Handling – Assigning jobs, negotiation and billing.

4.      Effective coordination with Intra management personnel, Clients, Consultants, Vendors, and Sub contractors to achieve the organizational target.

5.      Liasioning with various agencies of government and private sectors.  

6.      Direct Supervision of site activities. Especially working in tough terrain like rocky, forest, hilly and marshy. Have good experience of crossings by HDD, Cased crossing and open cut crossings. 

7.      Motivate team to work effectively in low budget project with satisfactorily handing over the system to client.

8.       Manage and coordinate multidiscipline engineering activities, to ensure the execution of project in safe, efficient, cost effective and timely manner.

9.      Act as primary technical coordination interface.

10.  Skillfully working on management software tools like Oracle, SAP, Primavera, along with use of Microsoft Office applications on daily basis. 

11.  Proactively providing effective solutions to higher management.

 

 

·         IL&FS Engineering & Construction Company Ltd. (May 2012- Till)

 

Manager – Project Coordination

 

Project Name; Halol Dahod pipeline project,

Contract type / Value: Turnkey / INR 52 Cr.  

Owner / Consultant / TPI: M/s. Gujarat State Petronet Limited / Tractable Engineering India Pvt. Ltd. / Certification Engineers International Limited.

Scope of Work: Design, engineering, procurement, supply, installation, erection, construction, testing, commissioning, operation and turning over services, activities and work for laying of 103 Km Ø12” API5L Gr. X65, 6.4/7.9/9.5mm thk pipe, HDPE/OFC, including civil, mechanical, piping, cathodic protection, electrical & instrumentation works in 7 nos. of SVs, dispatch & receiving stations and other facilities pertaining for transportation of natural gas from Halol to Dahod.

 

 

 

 

 

 

·         Kazstory Service Infrastructure India Pvt. Ltd., (Feb 2009 – April 2012)

 

Deputy Manager – Project Planning & Coordination

 

1.      Project name: Up – gradation of Konaban GGS & Pipeline grid project of Tripura Assets. (May.2011 – April 2012)

Contract type / Value : Turnkey / INR 247 Cr.

Owner / Inspection: M/s. Oil and Natural Gas Corporation Limited / American Bureau of shipping & industrial verification Pvt. Ltd

Scope of Work: Design, engineering, procurement, supply, installation, erection, construction, testing, commissioning, and turning over services, activities and work for laying of 53 Km Ø20” API5L Gr. X46, 34 km Ø16” API5L Gr. X46, 30 KM Ø6” API5L Gr. X65, 30 KM Ø8” API5L Gr. X65 respectively, including civil, mechanical, piping, cathodic protection, electrical & instrumentation works in 3 GGS, 3 manifolds, & 1 Terminal (Power plant) and other facilities pertaining for transportation of natural gas from various GGS & well head manifolds to OTPC, Palatana Power Plant and up gradation of existing Konaban GGS under Tripura Assets.

 

2.      Project Name: Bina – Kota pipe line project (Feb 2009 – May. 2011)

Owner / Consultant: Bharat Petroleum Corporation Limited / Consultant: Engineers India Ltd.

Contract Value: 118 Cr.

Scope of Work: Supply, installation, erection, construction, testing, commissioning, and turning over services, activities and works for laying of 258 Km Ø18” API5L Gr. X65, 6.4/7.1/9.5 mm thk pipe, HDPE/OFC, including civil, mechanical, piping, cathodic protection, SCADA, electrical & instrumentation works in 10 nos. of SVs, IP, dispatch & receiving stations respectively and other facilities pertaining for transportation of multi oil products from Bina Refinery to Kota Terminal.  

 

3.      Achieved execution of shut down work of M/s. BPCL’s MMPL damaged line at village Julwania (M.P.) as Operation In charge.

 

·         Essar Constructions India Ltd. (August 2007 – January2009)

 

Project Engineer – Section In charge of  Jamnagar Spread

 

Project Name: Vadinar – Bina pipeline project

Contract type / Value : Item rates / INR 184 Cr.

Owner / Consultant: Bharat Oman Refineries Ltd. / Engineers India Ltd.

Scope of work: Supply, installation, erection, construction, testing, commissioning, and turning over services, activities and works for laying of 503 Km Ø24” API 5L X70, 7.1/9.5/11.4mm thk. Pipe, HDPE/OFC including civil, mechanical, piping, cathodic protection, SCADA, electrical & instrumentation works in 14 nos. of SVs, IP, dispatch stations respectively and other facilities pertaining for transportation of Crude oil products from Vadina COT to Bina Refinery.   

 

·         Gammon India Ltd. (From May’07 to July’07)

Project EngineerSection In charge of Buxa Tiger reserve forest

Project Detail: Numaligarh – Siliguri Product Pipeline Project (Client: OIL / Consultant EIL 204 Km Ø18”X 6.4/7.1mm Thk.).

 

·         Zenith Erectors Pvt. Ltd.(From Sept’06 to April’07) (Sub contactor of Gammon India Ltd. For Numaligarh – Siliguri Product Pipeline Project)

Residential construction Manger

Project Detail: Laying of 32 Km Ø18”X 6.4/7.1mm Thk. Pipeline from Tista River to Siliguri Terminal, including 7 nos. major river crossings.

 

 

 

 

 

·         JaiHind Projects Ltd. (From March’02 to August’06)

 

Construction Engineer:

 

1.      Vijaypur – Kota Gas Pipeline project (Client: GAIL and Consultant: Veco Canada 70 Km   X Ø18”, Ø16”, Ø8”).

2.      Kailaras – Malanpur Gas Pipeline project (Client: GAIL and Consultant: Mecon Ltd.72 Km X Ø12”, Ø6”, Ø4”)

3.      Thulandi – Phulpur Gas Pipeline project (Client: GAIL, Consultant: Tractabel Engg.74 Km  Ø18” X 6.4 /7.1 mm)

4.      Ujjain – Jhabua OFC / HDPE Duct laying project (Client: GAIL, Consultant: TCIL 154 Km).

 

 Education:

 

·         Pursuing B. Tech (Mechanical), KSOU

·         Master of Business Administration (Marketing & HR), MIT, SMU, 61.65%; (Jan’2007 -Feb’2010).

·         Bachelor of Arts, Vikram University, 51.83%; (March 2002 - April 2006).

·         Diploma in Mechanical Engineering, RGPV, 61.68% ; (Dec 1998 - Jan’2002).

·         Certification in Russian Language, Vikram University, 67.20% ; (July’2001- Feb’2002).

 

Computer Proficiency:

 

·         AUTO CAD (all releases)

·           Microsoft Office, Primavera (presently using P 6.7), Oracle, SAP

 

Academic Trainings:

 

·         Gajra Gears Ltd. Dewas, manufacturer of Spiral and Helical Gears.

·         Gajra Bevel Ltd. Dewas, manufacturer of Bevel Gears.

 

Audit & Industrial Trainings:

 

·         IMS training by “SGQ Innovation” on ISO 9001; 2008, ISO 14001; 2004, and OSHAS 18001; 2007.

·         Faced IMS audit by BUREAU VERITAS.

·         Faced International Finance cooperation audit.  

·         Faced OISD audit.

·         Faced DGMS audit.

 

Extra Curriculum Achievements: 

 

·         Runner-up of Free Style M.P. State’s swimming championship, 1996

·         District champion Free style swimming competition, Ujjain(M.P.), 1994

·         Theatre Artist – Performed various plays in Bharat Bhavan, Bhopal under direction of renowned Habib Tanvir, Irfan Saurbh and others.  

 

 

 

 

 

 

 

 

 

PERSONAL DETAILS

 

Name:                              Dushyant Sharma

Father’s name:                 Dr. B.L. Sharma

D.O.B.:                            22nd Oct 1980

Height:                             5’10”

Marital Status:                 Married

Nationality:                      Indian

Languages Known:         Hindi, English and Russian

Leisure:                            Reading / Watching TV.                                                                    

 

                                                                                                                                   

                                                                                                                        Dushyant Sharma