Planning Engineer Construction & Maintenance, "ARABIAN INDUSTRIES LLC., OMAN", EPC of New & Old Onshore Gas Plant upstream & Compression Facilities
Permanent Address: Hutton Road, Masjid Gali, Asansol. Dist. Burdwan (W.B) – INDIA Mobile no.: + 968-95309723 (MUSCAT-OMAN) Mobile no.: + 91-9679643874 (HOME) Mobile no.: + 91-9749253379 (HOME) E-mail: f.mumtaz@rediffmail.com E-mail: f.mumtaz@yahoo.co.in |
Faisal Mumtaz
Personal Information |
Date of Birth: 13th Sep. 1982 Permanent Residency: Asansol – (West Bengal) |
Technical Education
|
Diploma in Mechanical Engineering (1999-2002)from Aligarh Muslim University (AMU) – Aligarh. |
Computer Skills |
|
Training Courses |
|
Professional Experience |
Arabian Industries LLC. – Oman
Service Period : December 2008 – Present Positions Held : Planning Engineer (Construction & Maintenance)
Dayim Punj Lloyd Ltd. – Saudi Arabia
Service Period : December 2007 – November 2008 Positions Held : Planning Engineer (Construction)
Olayan Descon Engineering / Industrial Co.Ltd. (U, U2, PP, S, A, R) – Saudi Arabia
Service Period : August 2005 – Nov. 2007 Positions Held : Planning Engineer
Neela Metal Finishing Co. Pvt.Ld. - Mumbai
Service Period : Nov. 2002 – July 2005 Positions Held : Planner cum Project Engineer
JOB RESPONSIBILITIES :
Arabian Industries LLC – Oman
Designation :Planning Engineer (Construction & Maintenance)
Arabian Industriesis a leading EPC Contracting Company specialized in Design, Engineering, Project Construction, and Fabrication and Maintenance of Process equipments & activities in Oil, Gas and Power Sectors. The company’s quality certifications include ISO-9001, ISO-14001, and OHSAS-18001. EMC contract was awarded by PDO toArabian Industrieson 2005 for 05yrs and same WPAI JV was formed betweenArabian Industries and Worley Parsonto cater the same Engineering, Maintenance and Construction Contract of South Oman.Project:
·Budour NE Phase 3B development-Detail Design, Procurement & Construction·Birba Flare system Up grade Project – (EPC)·Rabab S-2H1 Well Head Project – (PC)·Marmul Modification of Sampling Points of Hydro-Cyclones – (FCP)·Marmul: Installation of PIT and LIT on drains vessel V-2406 – (FCP)·Several Integrity Pipe line Projects for Gathering Station, On Plot as well asOff Plot.
Client: Petroleum Development Oman (PDO)
Responsibilities:
Major Shut down attended with WPAI :
NRPS S/D:Duration was 24 Hr. & Oil Deferment was 20540 M3 MMPS S/D: Duration was 20 Hr. & Oil Deferment was 14116 M3. RTQ S/D:Duration was 22 Hr. & Oil Deferment was 4786 M3. BIRBA S/D:Duration was 20 Hr. & Oil Deferment was 6492 M3.
DAYIM PUNJ LLOYD LTD.(Saudi Arabia – KSA )
Designation :Planning Engineer (Construction)
Punj Lloyd Limited is one of the largest engineering construction companies in India providing integrated design, engineering, procurement, construction and project management services for energy industry and infrastructure sector projects.
Project Summary:An EPC contract for Early Need Tankages (08 no. - 4169 Ton) as per API 650 & 01 vessel (Sphere – 310 Ton) as per ASME Sec. V111 Div. 1 with “U” Stamp.
Client: Fluor Arabia Ltd. Owner: Saudi Kayan (SABIC)
Responsibilities:
OLAYAN DESCON ENGG./INDL.CO.LTD. (Saudi Arabia – KSA )
An engineering (ISO 9001:2000) company with ASME / NB stamps (U, U2, PP, S, A, R)equipped to undertake large size turnkey Construction & Manufacturing projects for equipment such as Pressure Vessels & Columns, Heat exchangers & Fin Fan coolers, Storage Tanks etc. and other related equipment.
Designation:Planning Engineer (Project leader) for Design, fabrication & supply of Pressure Vessels, Heat exchangers, Column, Fin Fan Coolers & Storage Tanks.
Responsibilities:
Major Projects Completed with Olayan Descon:
(1) Client: TECNICAS REUNIDAS Owner: SAUDI ARAMCO Location: Jubail Duration: OCT.06 ~ OCT.07
Project summary :Design, fabrication and supply of HIC, CLAD & SS Pr. Vessels (33 Nos – 567 Ton) & Column (04 Nos – 376Ton) as per ASME SEC. VIII, DIV.1- “U” STAMP for the project of HAWAIYAH GAS PLANT EXPANSION
(2) Client: SNAMPROGETTI Owner: SAUDI ARAMCO Location: KHURAIS-KUC Duration: MAR.07 ~ SEP.07
Project summary:Design, fabrication and supply of CS & SS Vessels (07 Nos – 147 Ton) as per ASME SEC.VIII, DIV.1- “U” STAMP for KHURAIS CENTRAL PROCESSING FACILITIES PROJECT.
(3) Client: SNAMPROGETTI Owner: SAUDI ARAMCO Location: KHURAIS-KCC - KSA Duration: SEP.07 ~ JULY.08
Project summary:Design, fabrication and supply of wet sour services HIC Drum (04 Nos – 192 Ton) as per ASME SEC.VIII DIV.1 - “U” STAMP for KHURAIS CRUDE CONTRACT (KCC) PROJECT.
(4) Client: CTCI Owner: SABIC Location: JUBAIL Duration: SEP.07 ~ JUNE.08
Project summary:Design, fabrication and supply of Heat exchanger (08 Nos – 364 Ton) as per ASME SEC.VIII DIV.1 - “U” STAMP for the project of SAUDI KAYAN PETRO CHEMICAL COMPLEX EO / EG FACILITY.
(5) Client: SAUDI ARAMCO Owner: S. ARAMCO Location: HARADH GAS PLANT-KSA Duration: DEC.07 ~ AUG.08
Project summary :Design, fabrication and supply of Overhead Gas Inter Cooler & After Cooler (02 Nos – 21 Ton) as per ASME SEC.VIII /API 661/32-SAMSS-11 - “U” STAMP for DEBOTTLENECK CONDENSATE SYSTEM.
Achievements:
Letter of Appreciation: Certificate of appreciation by Olayan Descon for efficiently managing the material handling for the Saudi Aramco KHURSANIYA GAS PROJECT.
Neela Metal Finishing Co. Pvt.Ld. – Mumbai (India)
An engineering company of Pharma, Biotech & Food and Beverage engaged in Turnkey Installation of Water and also involves in design, supply and installation of Pr.Vessels, Heat exchangers, Process column and process & pressure piping.
Designation :Planner cum Project engineer
Responsibilities:
Majors Projects handled with Neela:
Client:Engineers India Ltd.
Client:Reliance Industries Ltd. Jamnagar
Client:Reliance Industries Ltd. Jamnagar
Client:Larsen & Toubro Ltd. (Hazira)
Client:Reliance Industries Ltd. Jamnagar
|
Personal Information |
Father’s Name : Late Md. Mumtaz Siddique Religion : Muslim (Islam) Sex : Male Language Known : English, Urdu, Hindi, Bengali & Arabic Passport no. : H-1954800 (Valid up to Dec 2018). Expected Salary : Negotiable Notice Period : 30 days Declaration : I hereby declare that all the above statements are correct to the best of my knowledge. |
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: