Senior Planner, PGQ, NDIA- New Doha International Airport- Terminal Complex Lounges
START Date:
February, 2013 Responsibilities:
- Develops and maintains critical path logic networks and bar charts utilizing all information.
- Develop and Maintain Activity Codes, Calendars, Resource Dictionary, WBS, Activity IDs, Etc as required to manage the schedule Includes Primavera system integrity (backups, baseline maintenance, etc).
- Develop an effective project plan template that can be utilized for schedule development, schedule control, and critical path analysis.
- Develop and maintain a process to proactively manage the critical path of the project.
- Perform resource planning and analysis, Forecast the demands of various types of resources including labor, materials, and equipment over the course of the project.
- Monitor, Analyzes, evaluates, and forecasts current status against an established baseline.
- Generate various types of reports progress, status, trends/KPI’s/Dash Boards to reflect the status of projects, often with visual aids such as bar charts, graphs and dash boards.
- Provide timely variance analysis and an early warning to management on critical or near critical activities. Provide corrective action plans as required.
- Assesses the impact of design or construction changes and schedule slippages.
- EOT Anlysis
- Support Cost Engineering process.
- Prepares and processes input to the cost control system for all cost reports.
- Support the bid process, including review vendors bid submissions and make recommendations for award.
- Quality Control – Ensuring compliance with quality standards and participation in ISO audits.