Construction Planning Manager, London Bridge Associates Ltd, Crossrail

START Date: 
August, 2009
END Date: 
April, 2011

Crossrail Design SCL Tunnels - Construction Planning Manager

Crossrail is the new high frequency, convenient and accessible railway for London and the South East. Approximately 22km of the route is underground incorporating 5 mined stations. Role required the management of the construction planning for the underground Sprayed Concrete Lining (SCL) Works for the stations, cross-passages, cross-over caverns and associated ventilation/intervention shafts and tunnels.

·  Production and updating of Primavera P6 programmes for all SCL works (5 Stations & 6 Structures).

·  Analysis of Value Engineering proposals and assessment of programme viability.

·  Production of planning reports and design documents relating to constructability.

·  Assessment of site requirements and production of site layout drawings.

·  Analysis of construction resources and waste for the production mass-haul and logistics plans.

·  Assistance to environmental engineers re. plant requirements and noise/vibration advice.

·  Advise design engineers on constructability issues and best practice.

·  Production of initial drafts of construction sequence drawings for RIBA F design.

Member of the Framework Design Consultant Review 

Experience Hours (Planning & Scheduling): 
3500