Project Control, Ranhill WorleyParsons, Exxonmbil EPCM

START Date: 
December, 2011
END Date: 
August, 2015

Project Control Engineer focusing on cost management & cost control activities:

  1. Project Set-up
    •   Working with project management, system administration and document controls to develop a project set-up that facilitates both internal and external Project Services requirements.
  2. Planning & Scheduling
    •   Provide Project Planning / Scheduling services to project teams to ensure that completion dates are being met including analysis and forecasting activities.
  3. Cost Management & Control
    •   Provide cost control services to project teams to ensure proper project cost management andprofitability monitoring.
    •   Develop cost breakdown structure and cost reporting procedures for overall project implementationbudget.
    •   Develop and establish overall project master cost plan for budgetary control.
    •   Prepare the overall monthly cost report of the project including Project statistics and trends.
    •   Prepare cost control input for monthly progress report for the project
    •   Monitor commitments, cost of works expended and cash flow forecasting.
    •   Prepare the cost report that should incorporate the information on the contract such as contract price, possible change, and reimbursable portions or IEWO (inter entity work order) related to the contract package (man hours consumed, indirect cost spent, etc.).
    •   Invoice Advice Reports (Verify & Approve Invoice Advice Reports before issuance to Finance).
  4. Reports
    •   Project Updates (weekly progress-collection & updates; schedule updates cost control & management;change order/variation management; cash flow status; subcontractor progress management; weeklyupload of project data to Project Controls Database).
    •   Project reporting (issue of Internal Weekly project status reports and clients External progress reports.)
  5. Interfacing activities
    •   Interface Management (facilitating communication between and among Project-Managers, Discipline Leads, System administrator and Document Controller).
  6. Proposal support
    •   Proposal support by providing Planning/Scheduling and cost estimation support for proposal purposes.
  7. Quality
    •   Quality Control (ensuring projects are controlled, monitored and documented according Project Services standards / specifications; conduct timely Project Controls audits on project level).
List of Projects Involved
NoProject/Tender TitlePhaseClientYear
1South ACIS Satellite (SA-SA) Topsidesfor Murphy’s Sarawak SK309/SK311SPSA Development Project.Detailed Engineering DesignBrooke Dockyard and EngineeringWorks Corporation (BDEWC) Dec 2014 - May 2015
2Detailed Design for E6 Field Development Project.Detailed Engineering DesignSarawak Shell Berhad.Jun 2014 - Nov 2015
3FPSO Detailed Engineering Services for Eni, Angola 15/06.Detailed Engineering DesignBumi Armada Berhad.Jun 2014 - Nov 2015
4DU 3719A – EMEPMI BrownfieldProject Engineering, Procurement,Construction Maintenance (EPCm) forExxonMobil Exploration andProduction Malaysia Inc. for projectsbelow:
  1. AFS 089 - Function Test Deluge.
  2. AFS 097 – Guntong A HVAC Rejuvenation FEED Project.
  3. AFS 091 – Bill of Materials & Sparing Review Project.
  4. AFS 099 – Structural Assessment of Platform SeAP.
  5. AFS 107 – Structural In-Place & Lifting Analysis for TaP.
  6. AFS 130 – Tapis E FWS Pipeline Repair Work.
  7. AFS 093 – Guntong A Structural Repair Program.
  8. AFS 129 – TaP Vent Structure Repair (Material Procurement)
  9. AFS 126 – GuD NAG - Conceptual & Detail Design Study.
  10. AFS 146 – GuA HVAC Rejuvenation – Detail Design.
  11. AFS 136 – Seligi B/C/D HVAC Rejuvenation (Phase 2)
  12. AFS 121 – TAEOR & Telok Project– Secondment of Personnel.
Conceptual/Feasibility Study,Front End Engineering (FEED),Detailed Engineering DesignExxonMobil Exploration andProduction Malaysia Inc. (EMEPMI)Dec 11 - Mar 15

 

Contribution/Activities Joined:

Internal training conducted by the company for oracle based software such as,
  • GBS (Global Business Solution) for manhours and cost tracking,
  • PROCOM (Revenue, Earn Value Analysis and Cost database);
  • InControl v8 & InControl v10 Software (Deliverables tracking and documet control system);
  • Primavera P6 and
  • EDMS (Engineering Documents Management Systems).
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
7000