IB-MOA Project - Industrial Building - EPC project (including site utilities)
•Schedules
oEPC (Engineering, Procurement & Construction) – Developed and maintained an Overall Master Project Schedule in Primavera P6.1. The schedule consist of an integrated WBS structure, 12 fields of EPS activity coding, multiple filter fields, cost loaded with TIC cost estimate and ability to open sub-contractor detail schedules within the master schedule by using the EPS structure. Critical path was clearly defined and managed.