Westinghouse Ltd

Graduate Trainee, Westinghouse Ltd, Various: WARM

START Date: 
September, 1994
END Date: 
September, 2000
2 Year Graduate Training Scheme, Various project roles, Project Engineer, Site Project Engineer, Design Engineer, Project Planner.

Senior Planner, Westinghouse Ltd, LUL PPP Re-Signalling

START Date: 
May, 2003
END Date: 
July, 2007

Westinghouse Rail Systems are exclusive suppliers of signalling equipment for the Metronet Consortium on both the BCV and SSL refurbishment projects for London Underground. The SSL project is currently in the design phase and the application / installation programmes are currently being developed. As a member of the SSL project team, tasked with the development, maintenance and progressing of a mid-level (7500 activities) baseline programme for the entire SSL project (£700m). Reporting directly to both the Senior Project Manager and Programme Manager.

Senior Planner, Westinghouse Ltd, WCRM

START Date: 
December, 2002
END Date: 
August, 2004

Responsible for project planning and performance measurement on the West Coast Route Modernisation, encompassing major resignalling works. Duties included:

  • Preparation of detail programmes for design, installation, test and recoveries.
  • Production of Key Performance Indicators including milestone trend charts, Earned Value Analysis and Resource loadings.
  • Preparing detailed duty rosters and hour by hour schedules in support of major blockade based commissioning works.
  • Preparing reports and analysis for senior management and client use.

Per Nystrom

First Name: 
Per
Last Name: 
Nystrom
Professional Since: 
Nov-1995 (29.0 yrs experience)
Oldest experience: 
Jun 2004 (20.4 yrs experience, WARNING: 8.5 years variance with Professional Since)
Years Experience: 
6

Thomas Jackson

First Name: 
Thomas
Last Name: 
Jackson
Professional Since: 
Aug-2008 (16.2 yrs experience)
Oldest experience: 
Feb 2003 (21.8 yrs experience, WARNING: 5.5 years variance with Professional Since)
Years Experience: 
7

Westinghouse Ltd Senior Planner

START Date: 
July, 2006
END Date: 
July, 2007
P3E Planner on re-signalling jobs - St Pancras and Thameslink.

Claims analysis based at Chippenham.

Westinghouse Ltd Planner

START Date: 
April, 2007
Current Role

Mohamed Reza Dalal

First Name: 
Mohamed Reza
Last Name: 
Dalal
Professional Since: 
Nov-2001 (23.0 yrs experience)
Oldest experience: 
Dec 2006 (17.9 yrs experience, WARNING: 5.0 years variance with Professional Since)
Years Experience: 
0

Westinghouse Ltd Planner

START Date: 
December, 2006
Current Role

Claire Hall

First Name: 
Claire
Last Name: 
Hall
Professional Since: 
Sep-2007 (17.1 yrs experience)
Oldest experience: 
Sep 2006 (18.2 yrs experience, WARNING: 1.0 years variance with Professional Since)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)