Assistant Planner

Assistant Planner, L&T, Mantri Altius Tower

START Date: 
July, 2004
END Date: 
November, 2004

19 Storeyed Residential Tower at Cubban Park Road, Banagalore
Responsible for:
1. Monitoring of schedules for Construction activities, resources and working capital.
2. Preparation of Client Running Bills and certification
3. Coordinating with all functional teams of the project for establishing and implementing QA/QC standards for project
4. Implementation of ISO procedures and standards at site.
5. Achieved 100% realisation of the certified billed amount from Client in scheduled time
 

Assistant Planner, Arthur Cliffe Planning Services Ltd, Multiple Projects

START Date: 
May, 2004
END Date: 
October, 2005

During this period I was responsible for the tender planning of M&E installations, mainly contracting to Haydon M&E.

Produce a structured, full detailed programme for all works associated with the tender of major projects such as Ballymore’s Pan Peninsular project in docklands.

Assistant Planner, Vector Management, Airfield Project – Heathrow Airport Terminal 5, Fit-out of BA offices

START Date: 
June, 2007
END Date: 
March, 2008

Planning for the fit-out of BA offices in Terminal 5 at Heathrow Airport.
Planning for commecial and leisure construction projects in Bulgaria

Assistant Planner, WorleyParsons, Roy Hill

START Date: 
November, 2006

Started as a Trainee Planner with WorleyParsons in 2006.

Assissted in Maintaining Master Schedules for:

Stage 5A & Stage 5B Dampier to Bunbury Natural Gas Pipeline.

Neerabup Facilities & Pipeline Project.

Mandurah Lateral Project.

Rio Tinto Expansion Projects (Electrical Upgrade, Security & Compliance Upgrade)

Weld Range Iron Project

Roy Hill Iron Ore Project.

Assistant Planner, Ove Arup & Partners, Various

START Date: 
February, 2005
END Date: 
September, 2005

Assistant planner with Arup Project and Programme Management. Working on bid programmes, design programmes, feasibility studies and construction phasings plans.

Assistant Planner, Amey Rail, West Coast Route Modernisation

START Date: 
June, 2001
END Date: 
May, 2004

-          Primavera P3 – Project and Installation Planning and Reporting inc. TPWS, AWS, OHLE, Signalling associated works. Development and maintenance of robust P3 resource and cost loaded plans for specific sub-projects, running parallel with contractor programmes and interfacing directly with the Master Plan.

-          Materials Planning and Control (> £1million).

Assistant Planner, Previously Network Rail, S & E

START Date: 
July, 2009
END Date: 
May, 2010
  • Progress/tracking and updating P3e projects by liasing with Project Managers, baselines and variances updating, cost loading, processing change control queries, creating new activities on P3e, interfacing of PEST from Oracle to P3e, copying and pasting of Projects to different EPS nodes in P3e, printing various reports from P3e and loading them to CCMS Document Control system, monitoring project slippage from Corp KPI and Dashboard reports and logging risks and issues on P3e.
  • Proficient in P6