Descon Engineering Abu Dhabi

Kashif Raza

First Name: 
Kashif
Last Name: 
Raza
Professional Since: 
Mar-1998 (26.8 yrs experience)
Oldest experience: 
Feb 2010 (14.9 yrs experience, WARNING: 11.9 years variance with Professional Since)
Years Experience: 
10

Cost Engineer - Project Control, Descon Engineering Abu Dhabi, Shah Gas Development Project - Package 2&3

START Date: 
June, 2011
END Date: 
February, 2013
 Prepares Work Breakdown Structure (WBS)and Organization Breakdown Structure (OBS)and developLevel III & Lev IV Plan using Primavera and its updating with making Latest forecast plans Familiar with scope of work,  Budget, all relevant contractual documents and develop project costestimates to prepare Latest forecast at completion (BCTC). Monitoring the project actual progress based on COPR, P-6 and Descon Project Monitoring System(DPMS)for generating and distributing performance reports. Monitoring the project
Experience Hours (Planning & Scheduling): 
650
Experience Hours (Cost Management): 
1800
Experience Hours (Forensic Analysis): 
900

Sr. Planning Engineer, Descon Engineering Abu Dhabi, ADGAS OFFSHORE (ADNOC) Turnaround

START Date: 
March, 2012
END Date: 
September, 2012

1. Planning to replace main Cryogenic Heat Exchanger

2   Create Notification, Material Identification and Material Order in SAP

3.  Reservation of material using SAP

4.  Preparation of detailed Level III and Level IV integrated shutdown / turnaround Execution Plan with resources & Prepare man-hours analysis

5.  Prepare Detail Package against each Work Request for execution.

6.  Responsible for the overall planning, development and monitoring of a project and maintain the project planning system and procedures.

Planning Engineer, Descon Engineering Abu Dhabi, Borouge Poly-Olefins Project

START Date: 
March, 2013
END Date: 
November, 2013

·         Creating/Updating schedules by using Primavera 6.7

·         Generating Daily/Weekly Progress Reports

·         Prepare progress reports using Earned Value Management

·         Coordinating day to day activities to ensure proper progress of project

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
0

Shoaib Meer

First Name: 
Shoaib
Last Name: 
Meer
Professional Since: 
Jun-2009 (15.6 yrs experience)
Years Experience: 
0

Jameel Ahmed Korai

First Name: 
Jameel Ahmed
Last Name: 
Korai

Consultant Planning Engineer

Claim (EOT) Analysis / Delay Analysis

Prjesct Planning / Scheduling

Cash Flow Analysis

Material/ Manpwer/ Equipment Deployment

Primaver P-6v7

Primvaer P-3

Project Progress Monitoring

Reports

Professional Since: 
Apr-2007 (17.7 yrs experience)
Oldest experience: 
Apr 2007 (17.7 yrs experience)
Years Experience: 
5

Civil construction planning engineer, Descon Engineering Abu Dhabi, Shah Gas Development Program ( Oil & Gas)

START Date: 
April, 2007

 

Primavera P6.7

Working in Oil & Gas Sector as Planning Engineer

Planned & Scheduled Leve-4 Schedule for Plant Construction Using Primavera P6.7.

 Manpower (Craft Wise) & Equipment Deployment Schedules.

Update Progress & prepare progress reports & curve for client & Internal Management.

Progress Monitoring, Review & Advice Monthly Execution Plan at Site. (Look ahead)

Analyze & Address Delay Issues, Communicate with Client, Propose Remedial actions.

Civil construction planning engineer, Descon Engineering Abu Dhabi, Shah Gas Development Program ( Oil & Gas)

START Date: 
April, 2007

 

Primavera P6.7

Working in Oil & Gas Sector as Planning Engineer

Planned & Scheduled Leve-4 Schedule for Plant Construction Using Primavera P6.7.

 Manpower (Craft Wise) & Equipment Deployment Schedules.

Update Progress & prepare progress reports & curve for client & Internal Management.

Progress Monitoring, Review & Advice Monthly Execution Plan at Site. (Look ahead)

Analyze & Address Delay Issues, Communicate with Client, Propose Remedial actions.

Planning Engineer, Descon Engineering Abu Dhabi, Maintenance Shutdowns & Construction Projects

START Date: 
December, 2006
END Date: 
June, 2011

 

Ø  Finalization of Scope of work

Ø  Preparation of detailed integrated Level IV Plan using Primavera.

Ø  Estimate manpower, spares/material in consultation with Execution and maintenance engineers

Ø  Responsible to analyze schedule status, physical progress, man-hours consumption, productivity, network logic, work sequence and three weeks and Four months look ahead plans.