Michael Edrad
Larsen and Toubro (L and T)
The State of Qatar
Construction Engineer, Structures-( October 2015 – Present)
Project Undertaken: Al-Wakra Bypass Road Project, P15
Project Description: The scope of work involves the construction of an 11km road consisting of 10 lanes and four future lane sections with additional collectors/distributor roads, frontage roads, and ramps. the freeway will provide access to existing and planned developments via five interchanges comprising of 20 bridges, 13 bicycle overpasses, 8 vehicular underpasses, 3 pedestrian bridges, and tunnels.
Worth of Project: $ 600 Million
Project Management Consultant: KBR Design Consultant: WSP Supervision Consultant: CH2M Hill
- Co-ordinate with the surveyor/QA/QC Laboratory Technician and all on-site activities and inspection of the work on daily basis, to ensure that an efficient daily progress has been obtained from all the equipment’s and men power engage in the work.;
- Ensure that all IR’s (Inspection Request) are in place with the proper documentation and/or approved shop drawing attachments for the proposed to be inspected areas of construction activities.
- Responsible for issuing a daily program of intended site activities to the foreman ensuring that all target outputs are achieved;
- Ensure the direct proper implementation of the work, materials used as per approved drawings, specification work requirements and carried out in accordance with the approved Method Statement;
- Responsible for liaising with the Consultants personnel for carrying out the inspection of the works in the time and date stipulated in the request.
- Responsible for monitoring all aspects of construction work in progress, to ensure compliance with the approved Method Statement and Inspection & Test Plan.
- Coordinate with the safety officer to ensure that the works are carried out in a safe working practice.
- resolving any unexpected technical difficulties and other problems that may arise;
- overseeing quality control and health and safety matters on site;
- day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors;
- planning the work and efficiently organizing the plant and site facilities in order to meet agreed upon deadlines;
- communicating with Construction Manager, Supervising and Design Consultant, including attending regular meetings to keep them informed of progress;
- Direct supervision and Implementation of structural works such as Concreting, and Grouting of Tendons;
- Excavation and backfilling, Reinforcement Works, Formworks and Scaffold Erection on Bridge Structures.
- Ensure that designs and drawings are implemented properly.
- Ensure that the standards of Client are implemented properly on the site.
- Coordinate with the Consultant, Client during Inspection of Works and discuss technical issues.
- Estimate materials needed on Site.
- Monitor and prepare daily report on work progress at the site.
- Responsible for HSE on site during the execution of the site activities;
- Inducting all site personnel through toolbox talks on safety issues;
SHIBHAL JAZIRAH CONT’G. CO. LTD. (Contractor)
Kingdom of Saudi Arabia
Site Engineer-( January 2009 – September 2015)
Project Undertaken: Construction of North West Leg Project
Project Description: An all-new 13 Km. Multilane Dual Carriageway with Service Roads complete with Drainage System, Lighting, Traffic Signage, Vital Appurtenances, etc. The Project also includes seven Diamond Interchanges (pre-stress voided slabs) at major road crossings, and Three Long Wadi Bridges with more than 700 – 40 m. Pre-stress Beams (Wadi Hanifah, Wadi Mahadiyah, and Wadi Ubayer) having a combined length of 2 Km.
Worth of Project: 998 Million Saudi Riyals
Consultant: Dar Alhandasah Shair and Partners
Exit 5, Malham Interchanges,King Abdul
Azis Interchanges,Riyadh K.S.A.
Jeddah-Jizan Expressway, Madina Expressway, Jeddah K.S.A.
Qassim-Madina Interchange, Qassim K.S.A
- Responsible for the direct implementation of the project and see to it that the works are in accordance and conformity with the approved plans and specifications as per International standard;
- Conduct and issue a daily program of intended site activities to foremen;
- Responsible for HSE on site during the execution of daily activities;
- Supervise testing works in the laboratory and in the field e.g. FDT, SPT /Borehole Testing, Strand Testing for relaxation, elongation, Tensile Strength, Compressive cylinder and beam testing and another related test;
- Responsible for the precast yard casting & pre-tensioning of beams, double T-beams, and hollow core slabs.
- To coordinate with other Senior Staffs, CE Inspectors and Resident Engineers;
- Confers with Foremen to provide technical advice and to resolve problems;
- Check and review the daily works of the staff;
- Supervise in the fabrication of reinforcing steel bars for bored pile, Abutment footing, retaining walls, columns, abutment wall and pier crossheads, masking wall, precast and pre-stressed Girder ,diaphragms, bearing plinth, slab, precast NJB and parapets, Box Culverts with reference in the structural plan together with bar bending schedules to ensure the stability of the structure, conduct checking of the fixed or installed reinforcements as per shown in plan.
- Conduct and supervise the installation of false work and form works as per shown in the plan to ensure the correct alignment, measurement and elevations of the structure as per the approved setting out data;
- Coordinates with the Project Manager regarding the requirement of the project such as manpower, materials and equipment;
- Conduct actual concreting of Bridge Structures e.g. Bored Pile, Pile cap and Footing, Columns, Crossheads, Slope protection and approaches, Box Culverts and Irish crossings, Precast Prestressed Girder, Box Type and with Void former, Bridges Slab, Precast NJB and Parapets ,Stressing of Tendons for Monostrand and Multistrand,and grouting of Post-tensioned tendons;
- Conduct Launching of Girders, Installation of Bridge parapets and New Jersey barriers as per the approved setting out plan;
- Check and review the bar bending schedules, shop drawing, and setting out data prior to the execution.
- Make daily, weekly, monthly accomplishment reportand other relevant issues encountered during construction.
- Make timecard for all the staff;
- Establish methods to meet work schedule and coordinate work activities with other departments to achieve the date of completion and to avoid conflict of works that may cause delay, respectively.
- Requisition of materials and supplies. Assist workers to facilitate the request of materials needed for the work.
- Resolve work problems and recommend work measures to improve productivity.
- Ensure standards for safe working conditions are observed.
- Ensure that design and project quality plan are maintained during the construction phase.
- Ensure that design and quality requirements are maintained during construction phase
- Ensure all necessary construction procedures are in place and approved.
- Ensure that all materials delivered and installed are approved as per material requirements.
- To communicate with the design team as per the site situation, accomplishment and etc.
- Participate, if required, to the elaboration of the procedure, and ensure it is well understood by the site team.
- Conduct checking of setting-out data (elevation, coordinates, alignment) and other relevant details of the structure with the surveyor and consultant.
- Conduct checking of reinforcements of the structure as per stipulated in the approved shop drawings and bar schedules and also alignment, level, dimensions, coordinates of the installed form works with the Consultant Inspector prior to casting.
Quantity Surveyors( July 2008-Dec. 2008)
- Estimate all the quantity needed for As-Built.
- Prepare Shop drawings using Auto Cad.
- Prepare Bill of Quantities in excel format.
- To coordinate with the Consultants to discuss matters regarding the execution and updates of the Project;
- Prepare bar bending schedules for all the structures concerning Bridges.
- Prepare setting out data and other survey details of the structures.
- Prepares quantity calculations for monthly billing certificates.
DPWH ( Department of Public Works and Highways) –CARAGA REGION
Regional Office, Butuan City, Agusan del Norte
Bridges and Roads Supervising Engineers( January 2006 - March 2008)
Project Undertaken: Construction of Bong-ao and Sibahay Bridges, Surigao del Sur
- General supervision for the project to see that the project is carried out in accordance with the plans and specifications;
- Ensure that all the staff are properly interpreting the approved plans and specifications;
- Ensure that the contractor must strictly comply with the requirements of the plans and specifications;
- Supervision of the works of the Staff;
- Confers with project staff to provide technical advice and to resolve problems; provides the necessary leadership and management support to enhance the efforts of project staff;
- Provides periodic reports and project updates regarding the accomplishment of the project;
- Confers regularly with the contractor’s representatives;
- Keep all records and prepares report, certificates, progress estimates and correspondence;
- Confers with the representative of Government Agencies, Inhabitants, and Property Owners, representative of public utilities and other interested citizens affected by the project or contractor’s operations.
- To check the quality of work as per contractual agreements of the contract, specification and according to DPWH standards/client circular.
- Responsible for actual inspection during contractor’s project operation to ensure that the construction methods and standards are being applied.
- Render Technical supports and give advice to the contractor needed for efficient and easy implementation of the Project.
PEO (Provincial Engineers Office). – Tandag City, Province of Surigao del Sur
June 2004 to Nov. 2004
Project Undertaken: Construction of Disaster building and Tagbina Municipal Hospital
On the Job Trainee
AutoCAD Operator(Draftsman)/Cost/Quantity Estimator/Site Inspector/Field Surveyor
- Field Inspection and site supervision;
- Responsible for the design and plan execution of the project.
- Performing QA/QC works;
- Supervision of project construction team including foremen, mason,steel fixers, carpenters, and labors.
- Cost Estimating ( Roads and Building Projects), Estimate BOQ, record all operational matters, conduct;
- Prepare Shop Drawings using AutoCAD, Bar Bending schedule in excel format;
- Ensure proper coordination between contractors;
- Check Material Quality of every project;
- Estimate materials needed for every project.
- Conduct Surveying works using Level and Total stations;
- Engineering Assistant;
- Ensure all project safety inclusive of manpower;
- Schedule daily activities in site for manpower and equipment.
- Prepare survey data sheet using land development.
- Industry:
- Region: