Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Feras Al Roumani

First Name: 
Feras
Last Name: 
Al Roumani

KEO International Consultants

 

Senior Planning Engineer, May 2009 – Present

As Senior Planning Engineer in the Education City – Convention Center Extension project, Mr. Al Roumani is responsible for reporting to the Client, evaluating Contractor’s programme and progress, and reviewing and assessing Time claims.

 

Time and Cost Engineer, May 2007 – May 2009

Various projects, including:

  • Al Tijaria Tower (Kuwait Trade Center)

High-rise building consisting of 38 floors, two basements, Ground floor, two mezzanine, 38 upper floors, and 20m high crown on the top Total built up area 76,000m².

Client: C.R.C.

Construction Manager: KEO

Consultant: Al-Jazera Consultants

Contractor: Sayed Hamid Behbehani

Project Value: KD18,500,000/- about (65M $)

  • Nofa Residential Towers

Residential Twin towers, 19 floor each, one basement as car park for 156 cars. Total built up area is 52,000m²

Client: Faisal Ali Abdulwahab Al Muthawa

Project Manager: KEO

Consultant: KEO

Contractor: Tarek Al Esa

Project Value: KD7,500,000/- about (26M $)

 

During Mr. Al Roumani time as Time and Cost Engineer, his responsibilities were:

Evaluating the Contractors schedule, updates, payments, delay, counter claim. Preparation reports to theClients, evaluation of Contractor's claims (Time and Cost)

M. A. Al-Kharafi & Sons Co., Kuwait

Planning Engineer, September 2003 – April 2007

Various projects, including:

  • Al Babtain Cultural Waqf Project

High-rise building consisting of 45 floors, three basements, Ground Floor, Three Mezzanine, 38 upper floors, upper roof and car parking for 150 cars at basement level.  Total built up area 66,000m2.

Client: A. S. Al Babtain

Project Manager: MADA & KEO

Consultant: Gulf Consult

Project Value: KD20,000,000/- (about 70M $)

  • Al Shiraa Tower Project

High-rise building consisting of 33 floors, two basements are 700 x 2 x M2, Ground Floor to Level 33 consisting of tenant space.

Client: Efad Holding

Project Manager: Proman Mace

Consultant: Najeeb Al Humeidui (NHEC)

Project Value: KD5,000,000/- (about 17.5 M $)

  • Kuwait Business City

A multi-storied car park building with 2 basements, ground floor, first second, third and roof.  The slabs are pre-cast TT slabs, and the park will be connected to Kuwait Business City Tower, the car park will accommodate 900 cars.

Client: United Real Estate Co.

Consultant: Dar SSH

Project Value: KD 4,500,000/- (about 16 M $)

  • International Hospital Complex

Concrete Works, roof waterproofing, pre-cast slabs, the hospital consisting of 5 floors and basement, and a complex adjacent to it of 12 floors and basement

Client: United Medical Services

Project Manager: Kuwait Medical Services

Consultant: Gulf Consult

Project Value: KD2,500,000/- (about 8 M $)

  • Design and Construction of Miscellaneous CFLCC Projects

Construction of AHA, Community Buildings, Battalion Tent, TDC Asphalt Road

Client: US Army

Consultant: US Army -Corps of Engineers, Virginia Camp

Project Value: US$5,700,000/-

  • Maldives International Airport

Construction of Control Tower, Main   Terminal, Domestic Terminal, ATS Building and Substations

Client: Maldives Airport Company

Consultant: Sir Fredrick Snow

Project Value: US$16,000,000/-

 

Mr. Al Roumani as planning Engineer was responsible for planning and follows up of the works, follow up the subcontractor, material procurement, preparing the project report, programme updates, attend progress meetings, and follow up the work on site, preparation of payment and claims.

And at initial stage, Mr. Al Roumani was in the Tender Department.  Pricing of:

1. International Hospital Complex, Salmiyah

2. Sultan Center in Hawalli

3. Avenues, Al Rai

4. Commercial & Residential Complex in Hawalli

5. US Army Corps, Different locations

6. Al Babtain Waqf Phase I (Earthworks), Sharq

7. Dubai International Airport, Phase II

 

Al-Khodari Sons Co., Accra, Ghana

 

Planning Engineer, May 2000 – August 2003

  • Construction of Six Bridges in mobile area in Ghana.

The bridges are precast, pre-stressed, post tensioned. The length of bridges range from 16 to 70m.

Client: Ghana Highway Authority

Consultant: DHV International (UK)

Project Value: US$15,000,000/-

Responsible for planning and follow up of the works, preparing project reports, monthly payments, following the materials procurement.

 

General Company For Engineering and Consulting GCEC, Damascus, Syria

Assistant Planning Engineer, May 1996 – April 2000

 

  • Housing Building of High Court - Nabik

Construction of the housing building which is 5 floors and one basement as car park.

Client: Ministry of Justice

Consultant: GCEC

Project Value: US$500,000/-

  • Building of Arabic Union of Workers

Construction of 8 floor building on 5,000 M2 area

Client: Workers Union

Consultant: GCEC

Project Value: US$1,500,000/-

Assist in following up the contractor schedule; assist in reviewing the monthly report.

  • Structural Department.  Checking and Designing of:

1. Utility Buildings in the Filtering Water Stations, Raka

2. Building of Syrian Petroleum Company against Earthquake forces

3. Workshop of planes maintenance against Earthquake forces

4. Al Assad library, Aleppo

5. Damascus University Student's House

6. The City Court House, Homs.

Professional Since: 
Sep-1995 (29.6 yrs experience)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)