Develop, update and maintain project plan (Level 4)
- Update and maintain Level 4 activities that include task management, engineering, procurement, construction, installation and completion activities
- Assist Task Lead in defining and freezing of workpacks, milestone dates and necessary aggregated milestone checks
- Update and maintain Level 4 plan in accordance to defined workpacks, milestone dates, PEM work process, and Client and contract requirements
Develop and update document development plan (Level 5)
- Update Level 5 plan where all documents are linked to relevant activities in Level 4
- Ensure that Level 5 plan are scheduled within the time boundaries for the corresponding activities
- Summarized manhour budgets for all documents linked to the same activity correspond to the activity manhour budget
Reporting of progress for Level 4 and Level 5 plan
- Ensure that approved changes are implemented in plans and forecast
- Update task activities with plan dates from suppliers and sub-contractors
- Consider HSE aspects in the sequencing and duration of activities
- Contribute to the preparation of necessary progress reports
- Report to Task Lead of all matters of importance
- Ensure that the work is performed in accordance with PEM, within budgets and with focus on quality and HSE aspects
- Implement corrective actions as necessary/agreed
SKSWOOD SENDIRIAN BERHAD PLANNING ENGINEER |
JUNE 2011 – DEC 2012 |
Development of project plan (Level 3 & Level 4 plan)
- Develop, manage and distribute project plan to the project team
- Interact with client and project team for sound agreement in project planning
- Define project schedules and baselines as per the project’s requirement
- Allocate and define project work sequence, duration, resource forecast, manhour estimate and critical path activities
- Revise and adjust schedules to reflect changes in the project
- Able to use Primavera 3 and 6 as a planning tool to prepare Level 4 and produce reports
Progress reporting during project execution
- Monitor and report progress via Mpower, Synergy and Primavera
- Save baseline plan and monitor variance against the plan
- Maintain project schedule and ensure manhour data is consistent with other systems (Mpower and Synergy)
- Produce, review and issue required project progress reports with required frequency
- Compare progress with baseline and identify trends and variances
Analysis of project plan
- Analyse schedule deviations, manhour variances and trends for their causes and potential impacts
- Ensure that claimed progress and expended manhours are accurate and valid
- Raise any discrepancies and over/under reporting with offshore admin, QAQC, construction
- Communicate the analysis of schedule variances to relevant project team members and the client for KPI calculation and submission.
- Prepare Close Out Report for completed campaign to determine KPI achievement
Miscellaneous
- Prepare monthly Offshore Resource Summary (ORS) report for Commercial Department
- Offshore stay during campaign period to act as a focal point for campaign progress reporting
- Liaise with personnel from various departments to maintain campaign schedule requirements
- Adhoc duties given by supervisor/manager
SKSWOOD SENDIRIAN BERHAD NPT ANALYST – BUSINESS SERVICES |
SEPT 2010 – MAY 2011 |
NPT Focal Point
- Liaise with offshore administrators on the daily reporting of PT/NPT related issues
- Analyse the data given and investigate related issues/constraints
- Familiarisation with Business Objects (Mpower reporting tool) and Synergy (internal Database Management) to extract data
- Communication with Commercial, Engineering and Operations Department personnel for feedback and support on NPT analysis
- Report findings to the management team as and when required.
- Conduct offshore visits as and when required
NPT Report Preparation
- Prepare and compile daily NPT report both internally and to the client on a daily basis
- Analyse daily NPT logs and prepare NPT risk report on a weekly basis to the management team
- Prepare various NPT analyses on an adhoc basis from supervisor/manager
- Conduct presentations internally and to the client on projects given
LEAN Initiatives
- Create and manage Visual Control Board (VCB)
- Conduct and analyse Process Mapping, identify issues/inefficiencies and propose recommendations
Miscellaneous
- Part of a team that implements the usage of smartcards for the company for timewriting purposes
- Adhoc duties given by supervisor/manager
SKSWOOD SENDIRIAN BERHAD OPERATIONS ADMINISTRATOR |
APR 2010 – AUG 2010 |
Daily Offshore Report Focal Point
- Compile and distribute daily offshore report internally and to the client
- Liaise with offshore administrators on reports coordination on a daily basis
Operations Department Focal Point
- Prepare onshore allowances (training, travel and meal) for offshore crews for Accounts Department
- Prepare CAPEX (Capital Expenditure) document for Procurement Department
- Prepare timesheet for offshore crews periodically for Commercial Department
- Act as a document controller for Operations Department
Personal Assistant
- Act as a personal assistant to the Operations Manager, Delivery Assurance Manager, and Offshore Coordinators
Miscellaneous