GS Engineering & Construction Corp. (GS E&C)
September 2011 – Present
Plant Planning & Schedule Control Expert Seoul, SOUTH KOREA
|
|
KOC Elevated Substations Project – South & East of KUWAIT
Acting as the proposal team member in bidding phase including:
- Preparation of contractual requirements of planning and scheduling parts of proposal;
- Preparation of Level I, II and III Schedule for EPCC parts of project.
Rabigh II Refining and Petrochemical Project – Rabigh, SAUDI ARABIA
The extension of Rabigh Petrochemical Plant in Rabigh city with initial value of 1.7 billion US$ awarded to GS E&C for completion of EPCC parts of project in CP3, CP4 and UO1 packages;
Acting as the project planner, scheduler and control expert including:
- Defining scope of work;
- Preparation of WBS of project;
- Preparation of Planning & Scheduling procedures including Progress Measurement System;
- Estimating time and development of Level II and III of schedule;
- Controlling the project using Earned Value Management and In-House management software named SITS (Schedule Information Tracking System).