Preparing the Time Impact Analysis for Contractors,
Preparing Delay notifications,
Forensic Analysis using different methods like As Planned Impact Analysis, As Build Impact Analysis. Window Analysis
Preparing the Claim Programmes, Reviewing the Claim Programme.
Preparing Claim Documents i.e. Claim write ups organizing the claim in order of events. etc.
Responsible for preparing the Baseline programme for the Dubai Metro Tender Team (Design Programme) and then integrating the Design, Construction , Systems and O&M programme together.