Please help me to document the methods of constructing of different trades as a step for preparing schedule template for all construction project trades as a step forward standardizing our construction projects scheduling. to be available for all our planning planet community.Let us consider this a project and plan for it. I suggest the checklist (WBS) for this issue to be according the uniformat which is available on the site:
http://www.uniformat.com
here you are the main items for you all to share your experience in our big project in your area of interest or experience:
A. SUBSTRUCTURE
A10 Foundations
A1010 Standard Foundations
A1020 Special Foundations
A1030 Slab on Grade
A20 Basement Construction A2010 Basement Excavation
A2020 Basement Walls
B. SHELL
B10 Superstructure
B1010 Floor Construction
B1020 Roof Construction
B20 Exterior Closure
B2010 Exterior Walls
B2020 Exterior Windows
B2030 Exterior Doors
B30 Roofing
B3010 Roof Coverings
B3020 Roof Openings
C. INTERIORS
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
C1030 Specialties
C20 Staircases
C2010 Stair Construction
C2020 Stair Finishes
C30 Interior Finishes
C3010 Wall Finishes
C3020 Floor Finishes
C3030 Ceiling Finishes
D. SERVICES
D10 Conveying Systems
D1010 Elevators
D1020 Escalators & Moving Walks
D1030 Material Handling Systems
D20 Plumbing
D2010 Plumbing Fixtures
D2020 Domestic Water Distribution
D2030 Sanitary Waste
D2040 Rain Water Drainage
D2050 Special Plumbing Systems
D30 HVAC
D3010 Energy Supply
D3020 Heat Generating Systems
D3030 Cooling Generating Systems
D3040 Distribution Systems
D3050 Terminal & Package Units
D3060 Controls & Instrumentation
D3070 Special HVAC Systems & Equipment
D3080 Systems Testing & Balancing
D40 Fire Protection
D4010 Fire Protection Sprinkler Systems
D4020 Stand-Pipe & Hose Systems
D4030 Fire Protection Specialties
D4040 Special Electrical Systems
D50 Electrical
D5010 Electrical Service & Distribution
D5020 Lighting & Branch Wiring
D5030 Communication & Security Systems
D5040 Special Electrical Systems
E. EQUIPMENT & FURNISHINGS
E10 Equipment
E1010 Commercial Equipment
E1020 Institutional Equipment
E1030 Vehicular Equipment
E1040 Other Equipment
E20 Furnishings
E2010 Fixed Furnishings
E2020 Movable Furnishings
F. SPECIAL CONSTRUCTION & DEMOLITION
F10 Special Construction
F1010 Special Structures
F1020 Integrated Construction
F1030 Special Construction Systems
F1040 Special Facilities
F1050 Special Controls & Instrumentation
F20 Selective Buildign Demolition
F2010 Building Elements Demolition
F2020 Hazardous Components Abatement
Please consider this project yours, and I am your servant or facilitator to compile the whole picture after collecting your feed back then you will have it complete and ready to use on your real-world projects.
Thank you all,
Yours,
Hussein, M.Sc. in construction management.
22-6-2005
Replies