construction civil works productivity rates

H
hany esmael 👤 Member for 18 years 3 months

Hi Everyone, I would like to share with you construction civil works productivity rates, I found this file very useful, what you think?

Productivity Rates for Tilling          Size. (Cms)LocationAreaManpowerProduction RateRemarks    (Sqm. Per day)       30 X 30FloorKitchen1 Mason, 1 Helper14Residential  Area by Sub-Contractor30 X 30Floor with patternCorridor1 Helper, 2 Masons10Residential  Area by Sub-Contractor40 X 40FloorBed room1 Mason, 1 Helper22-25Residential  Area by Sub-Contractor20 X 20FloorStore (small area)1 Mason, 1 Helper 10Residential  Area by Sub-Contractor30 X 60FloorBathroom2 Mason, 1 Helper6Residential  Area by Sub-Contractor30 X 30Floor + WallBathroom2 Mason, 1 Helper5 10 X 10WallKitchen1 Mason, 1 Helper8-9Residential  Area by Sub-Contractor30 X 60WallCorridor1 Mason, 1 Helper14-15Residential  Area by Sub-Contractor30 X 30WallBathroom2 Mason, 1 Helper7Residential  Area by Sub-Contractor     Residential  Area by Sub-ContractorNotes:     1. 1 Day = 10 hrs.     2. Gang Size:         1 Mason + 1 Helper for Kitchen and Bedroom.       2 Mason + 1 Helper for Bathroom.    

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts