SKYSCRAPER - SAMPLE CPM SCHEDULE

28 replies [Last post]
N Curgus PSP
User offline. Last seen 12 years 48 weeks ago. Offline
Joined: 11 Jul 2003
Posts: 18
Groups: None

DOES ANYONE HAVE A CONSTRUCTION SCHEDULE FOR A SKYSCRAPER THAT CAN BE SHARED? ALSO ANY ARTICLES/TIPS WILL BE APPRECIATED.

THANKS

NC

Replies

Ali Osama
User offline. Last seen 4 years 37 weeks ago. Offline
Joined: 19 Dec 2017
Posts: 39
Groups: None

Baseline Schedule (Tower)In Primavera P6 (XER)SPECIAL OFFER (40% Discount)



-The Baseline consists of 20,000 Activities
-Resource Loaded
-Well-Oriented WBS

 

https://bibloteka.com/product/high-rise-building-towers-in-primavera-p6-...

Zoltan Palffy
User offline. Last seen 8 weeks 14 hours ago. Offline
Joined: 13 Jul 2009
Posts: 3089
Groups: None

dig foundations

pour foundations

set steel in basement

set steel in lobby

set steel 2nd floor and repeate for as many floor that you have 

set roof steel

set exterior skin and windows and repeate for as many floor that you have 

fit out basement 

fit out lobby 

fit out 2nd floor and repeate for as many floor that you have 

done 

norodin ulama
User offline. Last seen 7 years 38 weeks ago. Offline
Joined: 5 Apr 2017
Posts: 2
Groups: None

none

Anning Sofi
User offline. Last seen 6 years 21 weeks ago. Offline
Joined: 22 Jan 2012
Posts: 89
Groups: None

Ronald, 3 storey construction is not the same as highrise building construction.

Why?  Among the many reasons, one of them, is logistic requirements... 

Akhtar Mehdi
User offline. Last seen 12 years 33 weeks ago. Offline
Joined: 27 Feb 2012
Posts: 3
Groups: None

hiiiii

 

 

Could you pls send me the schedule for the high rise building at

 

akhtarmehdi@hotmail.com

 

Note : I am attending PMI -SP classes these days and learnt about this most usefull site during classes.

 

Chris Oggham
User offline. Last seen 10 years 5 days ago. Offline
Joined: 20 May 2004
Posts: 605
Groups: None
Hi Arman,

I found your post #22 extremely interesting, pointing out as it did the implausibility and impracticality of Charlie’s skyscraper. I’m sure it won’t be too long before Charlie responds with a detailed explanation of how to resolve all of the difficulties.

I’m sure he’ll also get round to supplying the schedule that he promised to so many people as well, however, I won’t be holding my breath.

Chris Oggham
Abhay Gujrathi
User offline. Last seen 11 years 40 weeks ago. Offline
Joined: 22 Sep 2007
Posts: 12
Hi Charles,

Would you pls send me a copy too?
Email: abhay.gujrathi@ril.com

Thnks
Abhay
armando moriles
User offline. Last seen 13 years 43 weeks ago. Offline
Joined: 2 Feb 2003
Posts: 66
Groups: None
Sensei,

I really appreciate your idea and I would like to share any idea...

To start with...

1. If our building is 1,500 storeys excluding basements and podium and assuming a fast 5 day per floor structural works cycle using 5 complete form sets, etc...that would take us 7,500 calendar days;
2. At 4,500 m high (14,760 feet) would be beyond air traffic height limitation. We may require sovereignty of our air space;
3. I suggest we need a high altitude helicopter to do that;
4. etc...


Arman
luis lombardo
User offline. Last seen 4 years 6 weeks ago. Offline
Joined: 14 Nov 2007
Posts: 12
Groups: None
Hi Charles,

Would you pls send me a copy too?
Email: luis_lombardo@yahoo.com

Thnks
luigi
luis lombardo
User offline. Last seen 4 years 6 weeks ago. Offline
Joined: 14 Nov 2007
Posts: 12
Groups: None
Hi Charles,

Would you pls send me a copy too?
Email: luis_lombardo@yahoo.com

Thnks
luigi
SRIDHAR J
User offline. Last seen 12 years 43 weeks ago. Offline
Joined: 24 Aug 2006
Posts: 11

Its really exciting..

Whats the Built up area you are planning for..

& What is the FSI, Plinth area etc you are planning for..so that some conceptualisation can start off...

Regards

J Sridhar
Charleston-Joseph...
User offline. Last seen 3 years 22 weeks ago. Offline
Joined: 10 Jul 2005
Posts: 1347
Groups: None
Ronald,

The one I’m thinking of generating start design phase (concept, schematic, design development, contract documentation) Tender Phase, Construction Phase and Post Construction (defect liability period).

The Skycraper I have in mind is the tallest in the Universe 1500 storey high above ground level (4,500 meters), compose of three towers (skycraper) within built up area (podium and retails).

Ronald Romero
User offline. Last seen 1 year 19 weeks ago. Offline
Joined: 12 Nov 2006
Posts: 63
fellow PPers,

I believe that even though i did most of my planning was up to three floors , planning for a skycraper from first floor up will almost be the same save for some variation in the design and use of the floor it will be typically a copy of the floor preceeding it .

Am I right? So Charles send me a sample at ronnieksa@yahoo.com to learn some words, verbs and terminology planners are using when planning a skycrapper from ground up.

Regards,

kier legard
User offline. Last seen 15 years 1 week ago. Offline
Joined: 31 Jul 2006
Posts: 96
Groups: None


Hi Sensei Charles,




Are you involve in the construction of the highest building now? Can u please share to us your construction programme?


Regards,
kier


Zeinab El-Beialy
User offline. Last seen 14 years 29 weeks ago. Offline
Joined: 24 Mar 2008
Posts: 11
Groups: None
HI,

Would you please send me the SKYCRAPER programme and activities on my e-mail: zeinab100@gmail.com
thanks.
Charleston-Joseph...
User offline. Last seen 3 years 22 weeks ago. Offline
Joined: 10 Jul 2005
Posts: 1347
Groups: None
Dear All,

I’m surprise with the response. Very few are involve in building works, most are involve with other trade. What does this "sample Skycraper CPM means, maybe someday there will be migration to building works.

In my reply no 2
How high is your SKYCRAPER???? nobody answer
You want the sample of the Highest Building in Planet Earth. no answer
Also provide a typical floor area. no answer

"Maybe we can come up with something." This is very important.

What really I have in mind is a collaoboration of the best of the best plannning planet can offer. We, not me alone, will prepare a CPM Schedule using hypothetical tallest tower/skycrapper in the Universe.

How to do this?????

It will be unfold if our work will give us free time.

Cheers,
Sensei




kier legard
User offline. Last seen 15 years 1 week ago. Offline
Joined: 31 Jul 2006
Posts: 96
Groups: None
Hi Charles ,


Havent receiced your skycraper program.




Cheers
kier
charan hari
User offline. Last seen 14 years 20 weeks ago. Offline
Joined: 17 Oct 2007
Posts: 10
Hi Charles,

Would you pls send me a copy too?
Email: charanrao@hotmail.com

Your help would be appreciated.

Cheers,
Cherry
SRIDHAR J
User offline. Last seen 12 years 43 weeks ago. Offline
Joined: 24 Aug 2006
Posts: 11


Hi Charls

Could you pls send me a copy too at my mail adress -jxsridhar@yahoo.com


Regards
Sridhar
Gencay Yedikardesler
User offline. Last seen 13 years 24 weeks ago. Offline
Joined: 30 Oct 2003
Posts: 5
Groups: None

Hi Charles,

Would you pls send me a copy too?
Email: gencayy@yahoo.com

Thnks
Gencay
Mohamed Edris
User offline. Last seen 14 years 44 weeks ago. Offline
Joined: 20 Jul 2006
Posts: 12
Groups: None
Hi Charles,

Would you pls send me a copy as well?

Email: edrismido@hotmail.com


Thnx
Mohd
Sam Mohan
User offline. Last seen 4 years 27 weeks ago. Offline
Joined: 17 Dec 2007
Posts: 17
Groups: None
Hi Charles,


could you please drop me copy as well , samohan4@hotmail.com

thanks

sam
Nar Thap
User offline. Last seen 16 years 34 weeks ago. Offline
Joined: 12 Sep 2007
Posts: 73
Hi Charls, drop a copy to me as well at narnor2002@yahoo.com
your help will be appreciated.
regards,
Gordon Blair
User offline. Last seen 6 years 47 weeks ago. Offline
Joined: 29 Jul 2005
Posts: 166
Groups: None
Charlie’s still hawking round that WBS they used on the tower of Babel ;o)
A D
User offline. Last seen 4 years 6 weeks ago. Offline
Joined: 20 May 2007
Posts: 1027
Hi Charles,

By any chance, do you have any logistics plan for the high-rise buildings. I have asked it before on PP, but no help. What I am using now is totally unpresentable. If you have any, plz share. Can send the mail on ravirajab@yahoo.co.in
Kamal Khemchandani
User offline. Last seen 7 years 20 weeks ago. Offline
Joined: 17 Nov 2007
Posts: 13
Groups: None
Hi Charles,
While you are handing out the wbs for the highest building on Planet earth some guy in the middle east is making one double the height...so lets see how upto date the WBS really is..do send me one at kamalkhemu@hotmail.com

Best regards..
kier legard
User offline. Last seen 15 years 1 week ago. Offline
Joined: 31 Jul 2006
Posts: 96
Groups: None

Hi Charles,

Could you please send me any sample projects in High rise building.My mail Kier_70@yahoo.com


Regards,

kier
Charleston-Joseph...
User offline. Last seen 3 years 22 weeks ago. Offline
Joined: 10 Jul 2005
Posts: 1347
Groups: None
Hi,

How high is your SKYCRAPER????

You want the sample of the Highest Building in Planet Earth.

Also provide a typical floor area.

Maybe we can come up with something.

Cheers,