How do you Kill a P6 Session in a Standalone environment

Team, I have a usser that has been locked out of P6 17.8 it is a STANDALONE VERSION and there are issues trying to log back in has anyone had this issue or encountered this before and if so what is the fix to clear the session????

S
Santosh Bhat 👤 Member for 21 years 2 months

A Little more detail:

 

(This obviosuly only works if you are using P6 Standalone on a PC) - network issues will require an IT Administrator to resolve.

1) Click on Windows START>and type SERVICES

2) In the list of running Services, find SQL Server (SQLEXPRESS), right click and restart this service.

Otherwise DoduyKhuong has a great list of possible problems:

https://doduykhuong.com/2017/07/01/primavera-p6-professional-unable-to-connect-to-the-database-error/

 

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts