I've recently been updated from R7 to R8.3.2. and now find that in the Activity Details, Status Tab, the Expected Finish option is missing. Is there a way of getting it back or have Oracle deleted the option from the software? The only way I am currently able to enter an Expected Finish is to create an EF column and enter the date there. I'd be grateful for any advice.
P6 Professional R8.3.2 - Expected Finish Button is Missing
Forum Sponsor
Top Posters
Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Hi,
As in 8.3, you can insert the column pertain Expected Finish date. It will work the same way.
- Ravi
Thanks again Tom. No, the option/graphics don't exist/appear at all, even for the incomplete activites. I'll speak to the IT guy who installed the update and see if he can investigate the possible HTML problem.
Thanks for coming back so promptly Tom, however that checkmark is already selected. I'm attaching a screen dump below. The top section is R8.3.2 showing the option checkmarked but nothing shown in the Status Tab. Below it is the view in R7.0, where it is shown.
[[wysiwyg_imageupload:2143:]]