Max temperature allowed for labor in construction site ???

Hello all, I am sorry to start with a question

but i need realy any help, in my problem, 

my problem is there is a project for my company in Jordan - death sea, the our contract with the client is (design-build) contract. we are delay because the designer that work with us he is the cause of our delay, this is summary for the problem .I want to depend in my case in temperature to take extension of time from the client put my problem is I don't have the maximum temperature allowable for labor inconstruction site, can you guide me when I can find this temperature ???

 

M
Mike Testro 👤 Member for 20 years 6 months

Hi Jiahd

Welcome to planning planet

When I worked in Baghdad the rule was shade temperature in excess of 50 deg then all work stopped.

The official temperature from the Ministry never exceeded 49.5 deg.

It may be different in Jordan so maybe you can google the question or send a message to Samer.

Don't forget that in Ramadan different rules may apply.

Best regards

Mike Testro

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts