Senior Planning Engineer, Saipem Spa, Full field developement/ LNG Projects/Refinery upgrade/Power Plants/Pipelines

START Date: 
October, 2007

Duties:

-     Assist, when required, in the preparation of tender method statement including, design and detailed drawing planning, plant and site layout arrangement planning, use of formwork and tender documentation.
-     Prepare summary of contract details on which the execution programme will be based.
-     Integrates each projects program into the total projects planning scheme.
-     Coordinate Client’s, Supplier’s and Sub Contractor’s programs and resources and incorporates them into the master program for each job.
-     Organize and monitor the resources and time schedule as works proceeds.
-     Liaise with other departments.
-     Prepare reports for Clients, Site and Head Office.

Projects which I worked in:

-     GK3 Pipeline Project as Principal Project Lead
-     UTBS Hassi-Messaoud (Unit of crude oil treatment) large project for Sonatrach.
-     LZ2 Pipeline project (500 km between Arzew and Hassi R’Mel)
-     Power Plant (Gas turbine) Berroughia.
 