Duties:
- Assist, when required, in the preparation of tender method statement including, design and detailed drawing planning, plant and site layout arrangement planning, use of formwork and tender documentation.
- Prepare summary of contract details on which the execution programme will be based.
- Integrates each projects program into the total projects planning scheme.
- Coordinate Client’s, Supplier’s and Sub Contractor’s programs and resources and incorporates them into the master program for each job.
- Organize and monitor the resources and time schedule as works proceeds.
- Liaise with other departments.
- Prepare reports for Clients, Site and Head Office.
Projects which I worked in:
- GK3 Pipeline Project as Principal Project Lead
- UTBS Hassi-Messaoud (Unit of crude oil treatment) large project for Sonatrach.
- LZ2 Pipeline project (500 km between Arzew and Hassi R’Mel)
- Power Plant (Gas turbine) Berroughia.