Planning Engineer,

Major Responsibilites:

  • Preparing planning packages including WBS, all levels plan, prepared Critical path of the project.
  • Preparing master plan, base line plan , recovery plan, crush schedule,  and schedule for tender and insurance
  • Preparing Revnue cash flow , cost distribution and cash flow ā€˜Sā€™ curve
  • Preparing resource loading, man power histogram and equipment list
  • Performing Earned value management for measuring project performances, cost analysis and future forecasts