sr. qhse engineer, first philippine balfour beatty, sewage treatment plants, first Gas fit outs, CBCP convention center,

START Date: 
August, 2002
END Date: 
July, 2005
1. implementation and control of company systems 2. incident investigation and analysis for subsequent recommendation of action 3. improve and create procedures required to ensure identified risks are covered 4. management trainee 5. train staff to become hse and qa/qc engineers 6. monitor reports from all sites and determine critical projects that requires support from corporate qhse
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
3300
Experience Hours (Forensic Analysis): 
200

sr. qhse engineer, first philippine balfour beatty, sewage treatment plants, first Gas fit outs, CBCP convention center,

START Date: 
March, 2016
1. implementation and control of company systems 2. incident investigation and analysis for subsequent recommendation of action 3. improve and create procedures required to ensure identified risks are covered 4. management trainee 5. train staff to become hse and qa/qc engineers 6. monitor reports from all sites and determine critical projects that requires support from corporate qhse
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
3300
Experience Hours (Forensic Analysis): 
200

Quality Control Engineer, Alex. Construction Company (A.C.C) - Talaat Mostafa - Egypt, Madinaty City Project

START Date: 
April, 2015

Quality Control Engineer

Responsible for all construction works from Concrete till Decoration

Also responsible now for Soil, Site Safety,& Site Planning in New Group in Same project called ( B 8 )

Experience Hours (Planning & Scheduling): 
9150
Experience Hours (Cost Management): 
9150
Experience Hours (Forensic Analysis): 
9150

Structural Engineer, Rapid Construction, IUST University, Industrial Buildings

START Date: 
July, 2005
END Date: 
February, 2006

-              Structural Engineer, responsible for the Design Office in the factory for making all details and shop drawings.

-              Quality Control Engineer for the moulds and production.

Construction Services, Railworks Track Systems, Inc., Port of Grays Harbor

START Date: 
April, 2009

Responsible for all levels of quality assurance/quality control, environmental health and safety issues on heavy construction (railroad) project with multiple subcontractors. Developed initial submittals of QEHS plans, programs and procedures; Responsible for the effective employment of independent testing and laboratory personnel; Performed field inspections for safety, quality, and environmental health; Documented findings in reports.