Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Assist Owner with pre-shutdown

EQUIPMENT SPECIFIER, AMEC, VARIOUS OIL AND GAS SHUTDOWNS

START Date: 
January, 1999

Liaise with client engineering, process and inspection departments. From equipment work list, process clean requirements, and pressure vessel scheme of inspection sheets, specify equipment such as reactors, columns, drums and heat exchangers using P+Ids, piping specs, vessel drawings and blinds lists. Identify material that will be needed to isolate, open, clean, inspect, repair and test equipment.  Interface with the clients sub contractors on scaffold access and insulation removal. Specify material for equipment closure and hand back.

Senior Shutdown Planner, Sonangol, Shutdown 2010 Luanda's Refinery

START Date: 
December, 2009
END Date: 
August, 2010

Planning Consultant for Luanda’s Refinery 2010 Shutdown. Owner assistance in pre-shutdown and schedule control during shutdown.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content