I have only listed the job experience where I was lead planner. Both in this post, but in earlier posts.
2001 to present
General Manager for Virgin Islands Paving, Inc
Aside from being General Manager, I am also the dedicated Scheduler
Used Primavera Contractor until P6.21 and now use P6.71
Most of the scheduling is resource driven and the Primavera Document Library is extensive.
I have streamlined the submittal process and time sheets.