Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

1.Quality control. 2.Team Work 3.Time Management 4.Progress Reporting.5.MS-Office

Project Vetting Construction and Suppervision , NNPC - NPDC, Construction Roads & Bridges,Renovation and Constrion of Building Works, Site Preparation of Campsites and Drlling Locations

START Date: 
January, 1992

Preparation of Bill of Quantities, Tender Documents, Cost Estimation, Contract Adiminstration.  Project Control and Suppervision

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
20000
Experience Hours (Forensic Analysis): 
5000

Site Engineer / Estimator, CEEMM Construction Corporation , 1.Construction of warehouse and canteen building at San Miguel Corporation 2.Boiler & Control House at Pure foods Corporation 3.Installation of Gen Set House and associated equipment at Philippin

START Date: 
October, 1987
END Date: 
August, 1994
  • Manage and supervise construction of the manufacturing facilities such as the Production building, Administration building, Canteen building, Generator house, Warehouse building, roads and drainage, rip rapping, elevated water tank, deep well drilling, water distribution system, electrical distribution system and tower antenna
  • Estimating the Bill of Quantity (BOQ) of materials
  • Prepare program of work such as Bar Chart, PERT-CPM, Manpower Distribution and Cash Flow Diagram
  • Preparing project costing and scheduling of payments
  • Inspection and Payment approva

Site Engineer / Quantity Surveyor, ARABIAN OIL AND GASFIELD SERVICES LLC, 1.Various projects in Petroleum Development Oman such as construction of administration building & warehouse 2.Equipment foundation for pumps, transformers, hypo chloric generators

START Date: 
February, 2001
END Date: 
March, 2005
  • Attending project progress site meeting with the clients and/or consultants
  • Taking appointment to the clients for the new project’s inquiries
  • Preparing quotation for new projects and estimating bill of quantity (BoQ) includes cost of materials, labor, equipment and overhead cost
  • Daily supervising and monitoring the status of the site
  • Preparing and submitting weekly and monthly report to the Project Manager (i.e.

Site Engineer / Quantity Surveyor / Sales Engineer, AL-ZEERA INTERNATIONAL POOLS, 1.Some of our projects are the semi Olympic pool for H.H. SHK Hamad Bin Salman Al Khalifa 2.Three swimming pools with Jacuzzi for Nasser Hassa Compound 3.Seven swimming pool

START Date: 
September, 1994
END Date: 
December, 1999
 
  • Submit weekly and monthly transparent report to the Director of Operation about the progress of the project
  • Attend project site meeting and appointment with clients and/or consultants
  • Responsible in Project production and quality monitoring 
  • Responsible in completion and turn-over of the project to the client
  • Responsible in commissioning and demonstration of the project
  • Responsible in after-sales maintenance of the project
  • Design structures and hydraulic for water filtration systems of swimming pools, fountains,

Standardization and optimization of quality control throughout the entire production chain, Renault Alpine, Quality Control Manager at Renault Alpine

START Date: 
September, 2018

Student in master's degree Project Program Management and Business Development at SKEMA Business School and quality control manager at Renault Alpine. 

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
50

Standardization and optimization of quality control throughout the entire production chain, Renault Alpine, Standardization and optimization of quality control throughout the entire production chain

START Date: 
September, 2018

Student in master's degree Project Program Management and Business Development at SKEMA Business School

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
50

Intern, oando, Lubricant Production

START Date: 
January, 2014
END Date: 
August, 2014

OVH Energy is an Africa-focused compan

Experience Hours (Planning & Scheduling): 
300
Experience Hours (Forensic Analysis): 
900

Planning Engineer / Quality Control Engineer / Quantity Surveyor, Cementos Pacasmayo , Cement Plant Expantion, civil & concrete service

START Date: 
June, 2006
END Date: 
December, 2010
Cost Control, Planner, Project Control, QA/QC chief in diferent civil works, Plant Expansion.
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
2000

Planning Engineer / Quality Control Engineer / Quantity Surveyor, Cementos Pacasmayo , Cement Plant Expantion, civil & concrete service

START Date: 
June, 2006
END Date: 
December, 2010
Cost Control, Planner, Project Control, QA/QC chief in diferent civil works, Plant Expansion.
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
2000

QA/QC Engineer, Khansaheb Civil Engineering LLC, Palace Construction

START Date: 
December, 2007
END Date: 
June, 2008

1. Assist Project manager in preparing Quality assurance plan for the site.

2. Involve in site inspections by checking the construction activities following the required sequence of operations. Review the NCR’s and closing the same within the given time frame, clears inspection reports and NCR.

3.Review the methods of operation to the approved method statement applicable to the project. Reviewing the method statements prior to the submission to the customer.

Experience Hours (Planning & Scheduling): 
200

Market Place

No results found... (try selecting a different content filter)

Syndicate content