Senior Planning Engineer / Project Control Lead, BL Energy, Alba Potline 6 Compressor Substation

START Date: 
March, 2017
END Date: 
May, 2019

Based in Bahrain. Project control of the Alba Potline 6 Project and working on various PMC, EPC and EPCM tenders. Responsibilities include creation of Level 1, 2 & 3 Schedules using Primavera P6 Professional, covering Engineering, Procurement, Construction and Commissioning, Level 4 databases. Preparation of the project control documents (dashboards, milestones plan, project summary schedules, manpower histograms, progress curves and weekly / monthly reporting).Administration of the time sheet system. Liaison with the client, management, project, engineering and contractor’s teams.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
200

Construction Interface planner, Fluor UK, TCO – FGP – WPMP (Wellhead Pressure Management Project)

START Date: 
November, 2016
END Date: 
April, 2017
This role is to coordinate and maintain the engineering Construction Interface tracker which is the main multi discipline focal point document for the engineering team in Farnborough, Almaty and Houston with the construction site in Tengiz, Kazakhstan. To maintain good communication between all WBS areas, existing area meetings were enhansed with additional meetings so that the tracker was up to date and all changes visable for discussion in the weekly review meeting by management and lead engineers.  Any slippages within the multiple P6 schedules had to be challenged by liaising

Project Planner, Kier Construction, BEPPs and DIF at Sellafield

START Date: 
November, 2015
END Date: 
July, 2016

Repoted to Project Manager

Implemented 4D timeline during daily task briefing

Responsible for maiantaining accepted programmes, weekly and monthly updates, and project controls on Sellafield with monthly reporting, baseline tracking, period performance

Accountable for development of sequences including temporary works, production of histograms and cash flow , as well as planning time frames

Experience Hours (Planning & Scheduling): 
1400
Experience Hours (Cost Management): 
200

EPC Lead Planner, PT. Raga Perkasa Ekaguna, EPCC South Sembakung Gas Plant

START Date: 
July, 2010
END Date: 
June, 2011

• Planning, scheduling and updating Master Schedule (Level 1 – 2) and detail schedule (Level 3 - 4).
• Review, monitoring and preparing project schedule report summaries (including Engineering Document Register, Procurement Schedule, Expediting Report, S-Curve and Progress & Invoice Monthly Report) of Master Schedule that have been assigned.
• Coordinate with Engineering team for monitoring the Engineering deliverable.
• Coordinate with Procurement and Logistic team to monitor material preparation before construction works.

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Forensic Analysis): 
3500