%100- Project Planning; Progress Reporting; Primavera P6; Master Schedule

Programme Planner, Dong Energy, All Dong Energy Windfarms

START Date: 
January, 2016

(Contractor)

Programme Planner for all Windfarms in the Global Portfolio 

This is a brand new position within Dong Energy Operations building the Primavera P6 Environment from the ground up.

Designing and implementing WBS / Resources / Activity Coding / Processes / Procedures / Reporting

Experience Hours (Planning & Scheduling): 
5600
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

3 years as a Project Engineer, Infracom IT, %26 Power infrastructure works

START Date: 
January, 2008
END Date: 
September, 2010

Responsible of PROJECT MANAGEMENT Business Unit in INFRACOM IT; the Business Unit developed Enterprise PM Solution around PRIMAVERA P6 for many important Italian Project Based Enterprises.

Experience Hours (Planning & Scheduling): 
800
Experience Hours (Cost Management): 
200

Planning Engineer, Madina Group - Shell GTL, Shell GTL Turnaround 2012

START Date: 
March, 2012
END Date: 
July, 2012

ASteering complete array of project planning and management operations for smooth execution.

AFormulating and scheduling plans for Mechanical Works with plant running and working close to H2S pipe lines.

AJob list preparations with the support of SAP systems for Material Planning and Primavera for activity scheduling and resource allocation.

Experience Hours (Planning & Scheduling): 
550
Experience Hours (Cost Management): 
200

Master Scheduler, Midwest Steel, Miami Beach Convention Center (Phase 1 and 2) and GM Arlington Paint Shop

START Date: 
April, 2016

Administer Transition from Version P6 6.1 to Version 15.1.  Provided scheduling support for projects for steel erection on various projects. 

Experience Hours (Planning & Scheduling): 
250

Production Schedule, General Dynamics, Nassco-Norfolk, USS EISENHOWER, USS BUSH, USS TRUMAN, USS IWO JIMA

START Date: 
April, 2011
END Date: 
July, 2015

Built fully resource loaded, fully integrated master schedules for  repair of Naval Ships.  I was also responsible for maintaining the schedules through execution (growth, baselines, actuals etc.....).  I was part of a team that helped merge two scheduling departments during a aquisition/merger.

Experience Hours (Planning & Scheduling): 
8000

ANALYST / PLANNING ENGINEER, HASSAN ALLAM SONS (MISR SONS DEVELOPMENT), ERC

START Date: 
June, 2014
  1. Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
  2. Conduct field scoping to clarify scope as required.

Project Scheduler Specialist, Louis Berger Group, Inc. , Washington Suburban Sanitary Commission WSSC

START Date: 
February, 2013
END Date: 
June, 2013
WSSC is the 8th largest water and wastewater utility in the nation, with a network of more than 5,500 miles of fresh water pipeline and nearly 5,400 miles of sewer pipeline. The majority of Louis Berger Water Service LBWS’ new work is taking place in Baltimore and includes designing a water main, managing a sanitary sewer overflow Consent Decree Program and providing construction management services for the city. LBWS is also managing a sanitary sewer overflow consent decree program for Baltimore County. Working with LBWS to develop a P6 Master Schedule and Reporting tool for Consent De
Experience Hours (Planning & Scheduling): 
200
Experience Hours (Cost Management): 
50

Construction Project Planner / Senior Planner, Monadelphous Engineering Associates, Construction & Mining

START Date: 
August, 2006
END Date: 
March, 2013

•Preparation of Primavera Level 4 overall schedule for BHP Biliton Iron Mines Expansion
•Preparation of Claim Schedule base in the impact of delays.
•Analysed the base line and current Level 4 Schedule.
 

Experience Hours (Planning & Scheduling): 
40000
Experience Hours (Cost Management): 
0

Client side senior planner, Parsons Brinckerhoff (ME) Ltd, Medupi Coal Fired Power Station – South Africa

START Date: 
March, 2007
END Date: 
September, 2007

Assigned to Medupi Power Station Project (Greenfield) responsible for:
Development of Level 3 Project Master Schedule.
Procurement Planning.
Resource Planning.
Evaluation of Contractor/Supplier Schedules.
Key Event Schedule creation and management.
Interface Management.
Monthly Progress Reporting.

Experience Hours (Planning & Scheduling): 
1100

Planning Engineer, Hasan Juma backer trading & Cont co. LLC, Water Scheme to Ar Rustaq and other villayats

START Date: 
June, 2009
END Date: 
November, 2009
1) Planning and preparing projects' schedules using Primavera P3 software.2) Developed micro schedules to accurately track the balance work 3) Applied Fast Tracking & crashing on the schedules to deliver the project to end user4) Co-ordinating with Site Engineer / Sub contractor to give the REALISTIC SCHEDULE fo