Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

%100 Project Planning; Progress Reporting; Primavera P6

Senior Scheduler, RLB | Rider Levett Bucknall, Multiple - Consulting Planner

START Date: 
September, 2018

Senior Scheduler - responsibilities include:  contractor schedule reviews; developing CPM schedules for multi-level projects and programs

Schedule Manager, Black Construction Corporation, Airport

START Date: 
November, 2017

Prepared All neccessary documents related to project controls on scheduleing ang billing requirements for a project on a monthly basis.

Experience Hours (Planning & Scheduling): 
3150
Experience Hours (Cost Management): 
300

Area Planning Engineer, KALPATARU POWER TRANSMISSION lIMITED, PRP-AMD

START Date: 
December, 2013
END Date: 
September, 2015
  • Engineering, Procurement & Construction Services of Cross Country Pipe Line to Oil & Natural Gas Corporation Ltd. (ONGC) India, for Pipeline Replacement Project of Ahmedabad Assets (PRP-AMD), consist of pipeline of 4, 6, 8, 12, & 14 inch and combined length of 248 Kms.
Experience Hours (Planning & Scheduling): 
3400
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
0

Asset Planning Engineer, Avinash EM Projects (p) Ltd., DBNPL Project

START Date: 
March, 2011
END Date: 
December, 2013
  • Construction Services of Cross Country Pipe Line to Gail (I) Limited, India, for Dadri Bhawana Nangal Pipe Line Project (DBNPL) consist of pipeline of 8 & 16 inch and combined length of 116 Kms.
Experience Hours (Planning & Scheduling): 
7000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
0

Planning & Project Controls Engineer, Ovivowater, Medupi Power Station Project

START Date: 
January, 2009
END Date: 
September, 2011

Project Controls Engineer

Planning, progress reporting, cost control of the water treatment plant works to the Medupi Power Plant Project in South Africa. Development and implementation of progress measurement systems within the company and integrating project controls with quality management standard to receive Iso: 21500

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1450

Manager Assitant, Dynatrace, Sales Operation Management

START Date: 
June, 2018
END Date: 
September, 2018

<h1>Sales Operation Manager Assistant.</h1>

 

I was in charge of studying new options and solutions for the Sales Department Tools.

I did also a big lead import job. This required Big data and SFDC knowledge. 

 

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
50

Project Planner, Stantec UK Ltd, eep Tunnel Storm Water main Conveyance Tunnel, Terminal Pumoing Station and Sea-outfall

START Date: 
April, 2018

Project Planner working on Deep Tunnel Storm Water main Conveyance Tunnel, Terminal Pumoing Station and Sea-outfall project with Stantec UK Ltd in Dubai, United Arab Emirates.

Experience Hours (Planning & Scheduling): 
950

Lead/Senior Planning Engineer, Al Ain General Contracting Company, Presidential Guard Command Master Training Facilities Program (MTFP-B) 100m Indoor Fire&Movement Range

START Date: 
October, 2016
END Date: 
September, 2018

v  Oct 2016 – Sep2018 – Al Ain General Contracting LLC, Abu Dhabi, Senior Planning Engineer

·         Baseline programme preparationMonte Carlo Simulation.

·         Updating CPM schedule on a monthly basis for the constructions and progress claims (Earned Value) Interim Payments purpose.

·         Cost/Resource Loading (Cost, Quantity and Manpower Loading)

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
100
Experience Hours (Forensic Analysis): 
50

Area Schedule Manager, CSSi-France, Construction and revamping projects

START Date: 
January, 2000
END Date: 
November, 2018

As Planning Engineer i am using Primavera P6 and lots of Excel

Experience Hours (Planning & Scheduling): 
550

Planning & Project Control Coordinator, PIDEC, 2nd Urea and Ammonia Pardis Petrochemical, Aromatics Plant,MTBE Project

START Date: 
November, 2001
END Date: 
June, 2006

2003 ~ 2006

PARDIS Ammonia and Urea Project No.2

 

EP contract (Engineering, Procurement)

Applicant: Iran National Petrochemical Company

Contractor: Consortium of Toyo, Chiyoda & PIDEC

Position: Engineering planner and project controller

 

Key Responsibilities:

Experience Hours (Planning & Scheduling): 
11400
Experience Hours (Cost Management): 
1350

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content