Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Nigeria (AF.NG)

Chiedozie Akaeze

First Name: 
Chiedozie
Last Name: 
Akaeze
  • Project Scheduling and planning using the Primavera 6.
Professional Since: 
Oct-2011 (12.9 yrs experience)
Oldest experience: 
Oct 2011 (12.9 yrs experience)
Years Experience: 
7
Guild Accreditation: 
GPC Member

Romualdo Tiquia

First Name: 
Romualdo
Last Name: 
Tiquia

I am a graduate in Baliuag University with a course Bachelor of Science in Civil Engineering and degree holder of Professional Civil Engineer.

I have been working as a Scheduler / Planning Engineer / Quantity Surveyor / Site Engineer for almost thirteen years now.

Professional Since: 
Jul-2006 (18.2 yrs experience)
Oldest experience: 
Oct 1987 (36.9 yrs experience, WARNING: 18.7 years variance with Professional Since)
Years Experience: 
24

Scheduler / Planner / Quantity Surveyor, I.T.B. NIGERIA LIMITED, 1.Milan Intercontinental Hotel 24th storey building 2.Waves Office Projects10th storey (4 building) 3.Ocean Parade Phase II 12th Storey (4 building) 4.UACN Apartment 7th storey (2 building

START Date: 
July, 2006
END Date: 
March, 2009
  • Preparing master schedule and detailed schedule for the new project which includes activity ID, activity name, original duration, baseline project start, baseline project finish, activity logic and total float
  • Loading of resources - materials, labor, plant and machinery needed to carry out a construction project, plans, and technical specification.
  • Creating schedule of rates items (SOR), rate analysis (Global & Site Level) and resources rate estimate
  • Monitoring site progress through inputting actual date of activity start and finish, actual percentage work d
Experience Hours (Planning & Scheduling): 
2900
Experience Hours (Cost Management): 
2900

Planner / Scheduler / Head Quantity Surveyor, JULIUS BERGER NIGERIA PLC, 1.EPCC of Revamp of NLNG MOF Jetty 2 Facilities Project 2.EPCC of Marine Control Building & VTIMS Project for Nigeria LNG Limited 3.EPC of an Airfield (Bonny River Terminal Airstrip)

START Date: 
May, 2009
END Date: 
August, 2016
  • Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule
  • Loading of resources - materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification
  • Weekly updating all activities and scheduling the progress of the project comparing the schedule % complete versus performance % complete (plan % versus actual %)
  • Preparing and estimating the tender document
  • Preparation of claims ch
Experience Hours (Planning & Scheduling): 
7000
Experience Hours (Cost Management): 
7000

PLANNING AND SCHEDULING LEAD, SHELL NIGERIA EXPLORATION & PRODUCTION COMPANY LTD, BONGA FPSO - PRODUCTION MAINTENANCE

START Date: 
July, 2015
END Date: 
June, 2019

MAINTENANCE EXECUTION AND TURNAROUNDS

Shutdown Planning – Steering Committee appointments,

Strategy formulation, scope development and optimization.

Manage late scope submissions.

Pre-shutdown – Review materials demand and progress, move materials, prepare site, mobilization (Travel and HSSE induction).

Execution – Monitor progress and analyses and slippages.

Post shutdown – Demobilizations,

After Action Reviews (AAR).

Approve Functional plans,

Experience Hours (Planning & Scheduling): 
6450
Experience Hours (Cost Management): 
3550
Experience Hours (Forensic Analysis): 
250

Chimaobi Okpara

First Name: 
Chimaobi
Last Name: 
Okpara
  • 10+ years’ experience in project controls most recently as a Project Planner with outstanding ability to facilitate project delivery with Primavera P6, MS Project and MS Excel.

    EPC projects ranging from onshore fabrications to onshore/offshore pipeline construction, jacket and deck installation, offshore riser installation, topside hook-up and platform installations, subsea cable lay, pile foundation and civil/mechanical works.

Professional Since: 
Jul-2008 (16.2 yrs experience)
Oldest experience: 
Jul 2008 (16.2 yrs experience)
Years Experience: 
6
Guild Accreditation: 
GPC Member
GPC Pilot Tester
GPC Member Since: 
Tue, 2016-05-31 (All day) - Wed, 2055-05-05 (All day)

Ovie Obaruvwe Josiah

First Name: 
Ovie
Last Name: 
Obaruvwe Josiah
Professional Since: 
Mar-2010 (14.5 yrs experience)
Oldest experience: 
May 2018 (6.3 yrs experience, WARNING: 8.2 years variance with Professional Since)
Years Experience: 
49

PLANNING ENGINEER, TECHNIXS OILFIELD SUPPORT LTD., FORCARDOS YOKRI INTEGRATED PROJECT (FYIP) OFFSHORE

START Date: 
May, 2018
  • Developing project master schedule and ensuring a baseline is in place for progress tracking.
  • Monitoring and accurate update of progress, while tracking schedule changes and communicating same to the project team.
  • Creating work breakdown structure (WBS) and projects schedules as per contract requirements, making inputs to the project management plan.
  • Monthly review and update of schedule from accurate progress update gathered from site, flagging issues and corrective actions.
  • Preparing progress measurement sheet (PMS) and value of work done (VoWD) sheet

Tobore Eyemienokpe

First Name: 
Tobore
Last Name: 
Eyemienokpe
Professional Since: 
Apr-2017 (7.4 yrs experience)
Oldest experience: 
Apr 2017 (7.4 yrs experience)
Years Experience: 
49

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content