Working free-lance for Hbg on a £60m redevelopment of South Thames College. This project consisted of the demolition of the existing buildings and the construction of 3 inter-connected buildings. The structures were steel framed with RC decked slabs. My responsibilities consisted of producing a revised master construction programme, short term programmes, progress updates, and substantiating an extension of time application due to variations and client delays.